Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements

Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
January 6, 2017 Read time: 2 mins
Max safety for Peri’s MAXIMO system
298 Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations.

MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety.

The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system provides pre-assembled individual components such as the MXK Scaffold Deck or the PROKIT PMB Side Mesh Barrier. These lightweight and manually assembled system components ensure safe and ergonomic work operations.

In addition, new in the MAXIMO standard programme are panels with heights of 3m and 3.6m respectively.

For colder climates, PERI has developed the MXH Formwork System which can be heated whereby the MAXIMO Wall Formwork System is combined with heating elements. This means that concreting operations can also take place at low temperatures as the hydration process is not affected.

Assembly of the panel formwork and heating elements is carried out horizontally. Only two mounting bolts are required on the four frame corners each time. The standard height of the heating elements is 2.70m with standard widths of 2.4m and 1.2m. Corresponding extension elements and practical details such as suitable box outs for the BFD Couplers as well as for connecting the bracket system ensure efficient application of the system.

MAXIMO thus provides a further enhanced range of applications in the area of panel formwork with single-sided operations.

For more information on companies in this article

Related Content

  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece
  • Qatar tunnel project benefits from sophisticated formwork
    March 7, 2018
    A sophisticated formwork solution has played an important part in the construction of a new road and rail tunnel in Qatar in the Middle East. The formwork system was supplied by ULMA, which supplied its equipment for the construction of the Lusail Boulevard Tunnel in Qatar. The new tunnel provides access to the new Lusail City Development, from the heart of Doha and will be a vital transport link for the planned 2022 FIFA World Cup tournament. The overall Lusail City Development, located 15km north of Do
  • Quality paving with the new Dynapac Commercial Paver D17 C
    March 17, 2023
    The new D17 C commercial paver from Dynapac is ideal for medium to large parking lots and county roads, says the company. It comes with a standard paving width of 2.5m to 4.7m, while optional bolt-on extensions allow the unit to pave up to nearly 5.5m in width.
  • Czech bridge sees world formwork debut
    July 23, 2012
    The Czech government is investing heavily in upgrading and modernising the country's top-tier transportation infrastructure. This year alone, building works with a total investment of over E1.6 billion are planned or underway on the Czech motorway and main road network. Completion of the D8 motorway between the Czech capital Prague and Dresden in the east of Germany has a high priority, and as part of this large-scale project, the contracting consortium of SMP and Metrostav is erecting the 585m long Prosmyk