Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements

Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
January 6, 2017 Read time: 2 mins
Max safety for Peri’s MAXIMO system
298 Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations.

MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety.

The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system provides pre-assembled individual components such as the MXK Scaffold Deck or the PROKIT PMB Side Mesh Barrier. These lightweight and manually assembled system components ensure safe and ergonomic work operations.

In addition, new in the MAXIMO standard programme are panels with heights of 3m and 3.6m respectively.

For colder climates, PERI has developed the MXH Formwork System which can be heated whereby the MAXIMO Wall Formwork System is combined with heating elements. This means that concreting operations can also take place at low temperatures as the hydration process is not affected.

Assembly of the panel formwork and heating elements is carried out horizontally. Only two mounting bolts are required on the four frame corners each time. The standard height of the heating elements is 2.70m with standard widths of 2.4m and 1.2m. Corresponding extension elements and practical details such as suitable box outs for the BFD Couplers as well as for connecting the bracket system ensure efficient application of the system.

MAXIMO thus provides a further enhanced range of applications in the area of panel formwork with single-sided operations.

For more information on companies in this article

Related Content

  • Germany's advanced bridge construction
    February 24, 2012
    The A98 single-lane motorway in Germany is being extended by a second pair of lanes. Work began in 2007 and required building a second bridge at Rheinfelden in the south-west of the country, parallel to the existing bridge, and identical in design and construction.
  • ULMA's complete climbing solutions
    June 1, 2021
    ULMA's complete climbing solutions provides forming, climbing, and safety in a single product line
  • Peri bridges it with the incremental VARIOKIT VIL
    October 24, 2022
    For bridge construction, PERI is exhibiting the continuously developed VARIOKIT VIL Incremental Launching Facility. The system is used for the cost-effective production of external, internal and slab formwork for bridges using the incremental launching method.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v