Skip to main content

PERI/Vemaventuri sensors add value to construction processes

By David Arminas June 19, 2025 Read time: 1 min
The digitalisation of the construction industry is another key focus for PERI

PERI subsidiary Vemaventuri says that sensor solutions can positively influence the construction process. Sensors are used to facilitate decision-making on the construction site and save resources.

Sensors can communicate the pressure exerted on the formwork during concreting as well as temperatures for determining the degree of concrete maturity to determining the water content in fresh concrete. Vemaventuri’s numerous types of sensors when combined with PERI systems offers added value.

For more information on companies in this article

Related Content

  • Doka’s Concremote gives exact measurement for accurate control
    January 6, 2017
    Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
  • Peri raises its game with hydraulic cylinder for UP Rosett props
    February 3, 2015
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • Peri raises its game with hydraulic cylinder for UP Rosett props
    January 6, 2017
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • New methods allow concrete testing on the spot
    July 20, 2015
    This month we look at two new methods which are allowing concrete to be tested on the spot, and [over the page] we catch up on the latest news from concrete testing equipment suppliers - Kristina Smith writes Sometimes test results can be very bad news. If the concrete pavement or bridge abutment has already been poured, and if the concrete does not meet the specification, the outcome could be very expensive remedial work.