Skip to main content

Peri targets emerging markets with new shoring system

Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place. Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at
April 12, 2016 Read time: 1 min

298 Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place.

Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at bridge, tunnel and other civil engineering applications.

For more information on companies in this article

Related Content

  • Peri raises its game with hydraulic cylinder for UP Rosett props
    January 6, 2017
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • LeeBoy expansion strategy targets emerging markets
    March 12, 2014
    During the recent Conexpo event in Las Vegas, Kelly Majeskie, President of The LeeBoy Group, spoke about his expansion plans for the business “We’ve been working on a couple strategies for LeeBoy” said Majeskie, “an overseas growth strategy and a more focused approach to the US market. Like most businesses we saw a major downturn when the US housing market took the big hit in 2008/9.
  • LeeBoy expansion strategy targets emerging markets
    January 6, 2017
    During the recent Conexpo event in Las Vegas, Kelly Majeskie, President of The LeeBoy Group, spoke about his expansion plans for the business “We’ve been working on a couple strategies for LeeBoy” said Majeskie, “an overseas growth strategy and a more focused approach to the US market. Like most businesses we saw a major downturn when the US housing market took the big hit in 2008/9.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on