Skip to main content

Peri targets emerging markets with new shoring system

Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place. Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at
April 12, 2016 Read time: 1 min

298 Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place.

Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at bridge, tunnel and other civil engineering applications.

For more information on companies in this article

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    February 19, 2016
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system