Skip to main content

Peri targets emerging markets with new shoring system

Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place. Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at
April 12, 2016 Read time: 1 min

298 Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place.

Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at bridge, tunnel and other civil engineering applications.

For more information on companies in this article

Related Content

  • Peri launched UP MDS Formwork at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Peri launched UP MDS Formwork at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new UP MDS shoring tower to all markets outside France at INTERMAT 2012. The shoring tower is equipped with working platforms hanging from the handrails, providing a high level of security during the erection and dismantling phases, and a significantly reduced exposure to musculoskeletal disorders (MSDs). The working platform sets an automatic working position 1m below the handrail and follows the top of the tower. The system improves productivity by optimising weight (total weight of
  • Terex Washing Systems set to launch new AggreSand system
    April 3, 2013
    Terex Washing Systems (TWS) is making final plans to unveil what it says is a new innovative washing system. The AggreSand system is the latest addition to what the company says is an already extensive product portfolio, and it is due to be officially launched in Quarter 2, 2013. The TWS AggreSand system combines aggregate washing and screening with sand processing on a modular chassis, and brings together “tried and trusted TWS components in an innovative modular design.”
  • CNH’s new EMEA boss shares priorities and views on construction equipment market
    January 6, 2017
    Mario Gasparri, head of the CNH Construction Equipment business for its new Europe, Middle East, Africa (EMEA) business region, outlines his and the Group’s immediate and long-term priorities “The creation of Fiat Industrial by bringing together the three businesses of CNH, Iveco and FPT Industrial has resulted in a business operating on a vast scale: Fiat Industrial is one of the top three global groups in the capital goods industry. Because of the large scale of Fiat Industrial and the huge scope of our b