Skip to main content

Peri raises its game with hydraulic cylinder for UP Rosett props

Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
January 6, 2017 Read time: 2 mins
Hydraulic raiser for Peri’s UP Rosett Flex heavy-duty modular scaffolding props
298 Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props.

INTERMAT also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced number of tie points. It offers a clean improved concrete finish thanks to neat joint and tie arrangements.

There is a minimum use of filler timbers with six panel heights from 30cm to 3m, as well as five panel widths. Maximum permissible fresh concrete pressure is 80 kN/m², while powder-coating of the elements prevents concrete adhesion and makes cleaning easier.

The German company’s Gridflex is a flexible slab formwork system with accessible girder grids. It needs very short shuttering times because of the lightweight aluminium components and pre-determined assembly sequence. Also, telescopic filler elements ensure maximum flexibility. At INTERMAT, Peri will announce a new lateral safety guardrail for Gridflex.

Peri’s UP Rosett Flex heavy-duty modular scaffolding props have a hydraulic lowering and preloading unit. The heavy-duty prop is used for the safe transfer of concentrated loads of up to 200 kN. The hydraulic cylinder in the base allows the deformation-controlled lowering of the props in 10mm increments and the torque-controlled lowering of props under load by reading off in kN on the manometer. All components can be transported by hand and by using as much as possible standard system components the solution is extremely cost-effective.

A lot of Peri formwork and scaffolding has been used on a number of major road projects throughout Europe, including the immersed four-lane Limerick Tunnel, in the republic of Ireland. The project, from 2006-2010, included pouring five tunnel elements, each about 100m long.

For more information on companies in this article

Related Content

  • Concrete additive boosts performance
    September 27, 2017
    The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles. According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, water proofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry po
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Compact machines deliver more - for less
    February 14, 2012
    The mini and midi excavator sector continues to squeeze more out of less, with some innovative engineering solutions being applied to zero- and short-tailswing models - Geoff Ashcroft investigates. It is a vicious circle - customers seek smaller, tighter, ever more compact excavators, leaving manufacturers with the challenges of squeezing greater levels of technology into what is all too often an even smaller machine.
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th