Skip to main content

Peri raises its game with hydraulic cylinder for UP Rosett props

Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
January 6, 2017 Read time: 2 mins
Hydraulic raiser for Peri’s UP Rosett Flex heavy-duty modular scaffolding props
298 Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props.

INTERMAT also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced number of tie points. It offers a clean improved concrete finish thanks to neat joint and tie arrangements.

There is a minimum use of filler timbers with six panel heights from 30cm to 3m, as well as five panel widths. Maximum permissible fresh concrete pressure is 80 kN/m², while powder-coating of the elements prevents concrete adhesion and makes cleaning easier.

The German company’s Gridflex is a flexible slab formwork system with accessible girder grids. It needs very short shuttering times because of the lightweight aluminium components and pre-determined assembly sequence. Also, telescopic filler elements ensure maximum flexibility. At INTERMAT, Peri will announce a new lateral safety guardrail for Gridflex.

Peri’s UP Rosett Flex heavy-duty modular scaffolding props have a hydraulic lowering and preloading unit. The heavy-duty prop is used for the safe transfer of concentrated loads of up to 200 kN. The hydraulic cylinder in the base allows the deformation-controlled lowering of the props in 10mm increments and the torque-controlled lowering of props under load by reading off in kN on the manometer. All components can be transported by hand and by using as much as possible standard system components the solution is extremely cost-effective.

A lot of Peri formwork and scaffolding has been used on a number of major road projects throughout Europe, including the immersed four-lane Limerick Tunnel, in the republic of Ireland. The project, from 2006-2010, included pouring five tunnel elements, each about 100m long.

For more information on companies in this article

Related Content

  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Kleemann: Mobile Screen for Coarse Elements MOBISCREEN MSS 802(i) EVO
    February 21, 2023
    More flexibility and efficient on site
  • Peri breaks new ground with expansion of Guenzburg plant
    April 19, 2018
    Germany Formwork specialist Peri officially recently broke ground for the family-owned firm’s expansion of its scaffolding plant in Guenzburg, Bavaria. Peri, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, said that it is ramping up its production capacities.
  • Peri targets emerging markets with new shoring system
    April 12, 2016
    Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place. Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at