Skip to main content

Peri raises its game with hydraulic cylinder for UP Rosett props

Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
January 6, 2017 Read time: 2 mins
Hydraulic raiser for Peri’s UP Rosett Flex heavy-duty modular scaffolding props
298 Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props.

INTERMAT also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced number of tie points. It offers a clean improved concrete finish thanks to neat joint and tie arrangements.

There is a minimum use of filler timbers with six panel heights from 30cm to 3m, as well as five panel widths. Maximum permissible fresh concrete pressure is 80 kN/m², while powder-coating of the elements prevents concrete adhesion and makes cleaning easier.

The German company’s Gridflex is a flexible slab formwork system with accessible girder grids. It needs very short shuttering times because of the lightweight aluminium components and pre-determined assembly sequence. Also, telescopic filler elements ensure maximum flexibility. At INTERMAT, Peri will announce a new lateral safety guardrail for Gridflex.

Peri’s UP Rosett Flex heavy-duty modular scaffolding props have a hydraulic lowering and preloading unit. The heavy-duty prop is used for the safe transfer of concentrated loads of up to 200 kN. The hydraulic cylinder in the base allows the deformation-controlled lowering of the props in 10mm increments and the torque-controlled lowering of props under load by reading off in kN on the manometer. All components can be transported by hand and by using as much as possible standard system components the solution is extremely cost-effective.

A lot of Peri formwork and scaffolding has been used on a number of major road projects throughout Europe, including the immersed four-lane Limerick Tunnel, in the republic of Ireland. The project, from 2006-2010, included pouring five tunnel elements, each about 100m long.

For more information on companies in this article

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • New bridge for old Russian city
    July 30, 2012
    Murom, one of Russia's best preserved old cities, is situated in the European part of the country, around 300km to the east of Moscow. The most important industry and economic activities are mechanical engineering along with timber and textiles. The location on the River Oka, a tributary of the Volga and thus an important waterway, as well as the good connections to important main roads and rail routes, are positive economic factors. It is near Murom that German formwork and scaffolding specialist PERI is p
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    January 6, 2017
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t
  • PERI’s VARIOKIT as cantilever equipment takes to bauma stage
    February 13, 2013
    PERI’s VARIOKIT engineering construction kit, being showcased at bauma, is said by the German firm to have already provided cost-effective and flexible solutions for superstructures for several years. From project-specific solutions for tunnels, to system applications in bridge construction and heavy-duty towers for the highest loads, VARIOKIT is extremely adaptable. Now it can also be used for the balanced cantilever method with a few additional, newly developed system components. The new components for t