Skip to main content

Pavetest’s new thermal cracking test

Matest subsidiary Pavetest launched its new thermal stress restrained specimen test (TSRST) machine, the TSRST-Multi, at bauma. Designed for tests set down in the AASHTO TP10-93 and EN 12697-46 standards, the machine can test three specimens simultaneously inside a temperature-controlled cabinet which can vary in increments of 10 degrees between - 40 and +40 degrees C. “We decided to come up with a flexible approach where each station can test statically or dynamically. And you can have any combination,”
April 20, 2016 Read time: 2 mins
282 Matest subsidiary 7955 Pavetest launched its new thermal stress restrained specimen test (TSRST) machine, the TSRST-Multi, at bauma. Designed for tests set down in the AASHTO TP10-93 and EN 12697-46 standards, the machine can test three specimens simultaneously inside a temperature-controlled cabinet which can vary in increments of 10 degrees between - 40 and +40 degrees C.

“We decided to come up with a flexible approach where each station can test statically or dynamically. And you can have any combination,” said Pavetest MD Con Sinadinos. “It’s been in development for six months.”

Sinadinos highlighted a new approach to the design of the machine, where all the refrigeration elements are isolated within one detachable unit. This means transportation costs can be lower, because certain units are not so tall, and it makes maintenance easier, he said.

Pavetest has developed its control and data acquisition system so that eight channels rather than 16 are needed, which means that a smaller control unit can be integrated into the machine. “Normally you see a mass of wires coming out of these machines. Here they are all hidden out of the way,” said Sinadinos.
All videos

For more information on companies in this article

Related Content

  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w
  • Hitachi helps to build a better Stockholm
    November 19, 2024
    The ZE135 electric excavator has been put to the test on a high-profile development in the Stockholm Green Innovation District. This new growth area for technology and sustainability is being developed with the goal of renewing and building urban spaces with climate-smart solutions.
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to