Skip to main content

Paschal goes ultra-light with a new range of powder-coated aluminium formwork panels

April 10, 2025 Read time: 1 min
The new NeoR aluminium panel from PASCHAL

Paschal is supplementing its NeoR range of lightweight, steel formwork panels with even lighter powder-coated aluminium panels.

The new aluminium panel is 75cm x 150cm and weighs only 23kg. The permissible fresh- concrete pressure is 50kN/m², whereby the evenness tolerances according to DIN 18202, Table 3, line 6 are observed.  

The NeoR strap 75 is used to connect the steel and aluminium panels quickly and securely, guaranteeing full compatibility. Meanwhile, the NeoR Multi Clamp 0-10cm has the same properties, which also incorporate plastic filler pieces for residual dimension compensation to the nearest centimetre.

Paschal says that the steel-aluminium connecting bolt provides a cost-effective connection between steel and aluminium panels. This is inserted from the aluminium side and enables the NeoR aluminium panel to be connected to the steel panels of the NeoR or modular formwork.

For small concrete surfaces or heights, the aluminium panel is ideally suited for use by hand if no crane is available or if it is not worthwhile to set up and dismantle a hoist.  

For more information on companies in this article

Related Content

  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    February 19, 2016
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    January 6, 2017
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.