Skip to main content

Paschal goes ultra-light with a new range of powder-coated aluminium formwork panels

April 10, 2025 Read time: 1 min
The new NeoR aluminium panel from PASCHAL

Paschal is supplementing its NeoR range of lightweight, steel formwork panels with even lighter powder-coated aluminium panels.

The new aluminium panel is 75cm x 150cm and weighs only 23kg. The permissible fresh- concrete pressure is 50kN/m², whereby the evenness tolerances according to DIN 18202, Table 3, line 6 are observed.  

The NeoR strap 75 is used to connect the steel and aluminium panels quickly and securely, guaranteeing full compatibility. Meanwhile, the NeoR Multi Clamp 0-10cm has the same properties, which also incorporate plastic filler pieces for residual dimension compensation to the nearest centimetre.

Paschal says that the steel-aluminium connecting bolt provides a cost-effective connection between steel and aluminium panels. This is inserted from the aluminium side and enables the NeoR aluminium panel to be connected to the steel panels of the NeoR or modular formwork.

For small concrete surfaces or heights, the aluminium panel is ideally suited for use by hand if no crane is available or if it is not worthwhile to set up and dismantle a hoist.  

For more information on companies in this article

Related Content

  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Ulma Construction expands circular formwork offering with Biramax
    October 28, 2016
    Spanish company Ulma Construction said that is has developed Biramax in an effort to create adjustable formwork at once easy to assemble and profitable for the client, in terms of both use and durability. The adjustable circular formwork Biramax has only four adjustment points and the placement of compensation plates between panels is easy to accomplish. The panel frame is made of the high-quality and resistant galvanised steel and the plastic surface of the formwork panels is highly moisture resista
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.