Skip to main content

Paschal goes ultra-light with a new range of powder-coated aluminium formwork panels

April 10, 2025 Read time: 1 min
The new NeoR aluminium panel from PASCHAL

Paschal is supplementing its NeoR range of lightweight, steel formwork panels with even lighter powder-coated aluminium panels.

The new aluminium panel is 75cm x 150cm and weighs only 23kg. The permissible fresh- concrete pressure is 50kN/m², whereby the evenness tolerances according to DIN 18202, Table 3, line 6 are observed.  

The NeoR strap 75 is used to connect the steel and aluminium panels quickly and securely, guaranteeing full compatibility. Meanwhile, the NeoR Multi Clamp 0-10cm has the same properties, which also incorporate plastic filler pieces for residual dimension compensation to the nearest centimetre.

Paschal says that the steel-aluminium connecting bolt provides a cost-effective connection between steel and aluminium panels. This is inserted from the aluminium side and enables the NeoR aluminium panel to be connected to the steel panels of the NeoR or modular formwork.

For small concrete surfaces or heights, the aluminium panel is ideally suited for use by hand if no crane is available or if it is not worthwhile to set up and dismantle a hoist.  

For more information on companies in this article

Related Content

  • Peri premiere’s PROKIT EP 110 at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
  • Kapsch gantry goes green
    December 20, 2022
    Familiar product is given new spin by making motorway structure out of wood.
  • Atlas Copco’s Hydro Magnet
    May 14, 2014
    The latest complement to Atlas Copco’s range of hydraulic attachments is the Hydro Magnet, a range of profitable tools for recycling plants, scrapyards and the demolition industry. Hydro Magnets enable valuable iron and steel to be separated quickly and easily from concrete waste for subsequent recycling. Simply installed on the existing grapple or shear installation, they require no extra generator or electro cable on the carrier. Two Hydro Magnets are available in two versions, as a fixed magnet (F),
  • New testing equipment and services
    April 21, 2016
    This month’s round-up looks at new equipment from a number of manufacturers and a new bitumen testing service in the UK from global player Intertek - Kristina Smith reports CONTROLS GROUP has unveiled new machines from each of its specialist divisions, including a new triaxial tester from its soil mechanics arm Wykham Farrance; an E-modulus tester from its concrete testing division; and an asphalt binder analyser from PAVELAB SYSTEMS, its asphalt division. TRITECH is the result of 50 years of developm