Skip to main content

Parking problem for careless driver

Sometimes that tempting empty parking space may be clear for a reason. One motorist learned the hard way that it pays to think why no-one else has left their vehicle in that area.
December 2, 2014 Read time: 1 min
Sometimes that tempting empty parking space may be clear for a reason. One motorist learned the hard way that it pays to think why no-one else has left their vehicle in that area.

Related Content

  • Permanent repairs at lower costs thanks to JCB’s revolutionary PotholePro machine
    December 15, 2021
    Shock figures from the AA reveal more than £11bn-worth of potholes need repairing across the UK and British digger maker JCB is on a mission to fix them.
  • CECE Congress focuses on future of construction
    May 8, 2012
    The bi-annual CECE Congress was held in Spain when participants looked forward in a bid to see what will happen in the next ten years. Growth markets such as China, India and Brazil offer big opportunities to European construction equipment manufacturers. As companies, particularly those from China, start to expand outside their own countries the competition for business will increase, and it has been claimed that there is no such thing as 'the global market', rather it is the sum of hundreds, if not thousa
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Machinery/material control with Ma-estro’s Transport Q
    January 6, 2017
    Italian company Ma-estro has developed the Transport Q control system for the control of material and machinery movement on large road building sites and in quarries. It says that on building sites characterised by highly dynamic situations, the main problem has been that of tracing the movements of equipment and materials entering and leaving the site, and doing this automatically, safely and accurately. “A control system entrusted to a number of persons in continuous rotation, where external personnel pay