Skip to main content

Parking charges

A British man left his high-value, high-performance Mercedes with a valet parking firm at a UK airport. On his return he was dismayed to discover the car had clocked 1,300km or so in his absence, despite the firm’s facility being just 6.5km from the airport. Police tracked the car having been driven through four English counties. However the firm said it was unable to determine which of 15 employees had taken the car. Meanwhile another British man managed to forget where he had parked his VW. He had att
March 23, 2016 Read time: 2 mins
A British man left his high-value, high-performance Mercedes with a valet parking firm at a UK airport. On his return he was dismayed to discover the car had clocked 1,300km or so in his absence, despite the firm’s facility being just 6.5km from the airport. Police tracked the car having been driven through four English counties. However the firm said it was unable to determine which of 15 employees had taken the car.

Meanwhile another British man managed to forget where he had parked his VW. He had attended a party in Norwich but was afterwards unable to recall where he had left the car. A resident of Newmarket, he faced a round trip of 144km each time he returned to Norwich to search for the vehicle. It was eventually located parked in a shopping centre and the man had to pay heavy parking charges.

Related Content

  • New chapter for bituminous slurry in Colombia
    January 11, 2019
    Colombia’s San Rafael road concessionaire is using its first VSB Macropaver 12B unit to maintain a road carrying heavy traffic volumes – Enrique Saez writes The use of bituminous slurry for road maintenance works in Colombia is taking a new step forward with the purchase of equipment from VSS Macropaver by road contractors in the country. Engineer Ezequiel Romero, manager of the concessionaire San Rafael, explained that the application of bituminous grout has delivered major benefits for the firm. The c
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil
  • Parking problem
    February 27, 2012
    An Australian couple caused something of a parking problem with their vehicle in a quiet residential Sydney side-street. The issue was that their vehicle should have been in the air rather than on the ground, as it was a single engine Piper aircraft.
  • How Hitex changed its products to meet the demands of India’s roads
    December 7, 2016
    The Indian Government is keen to embrace new technologies and ideas from overseas but as Hitex International discovered, Indian roads need very special products - Kristina Smith reports