Skip to main content

Optimising reinstatement with a new tool

A new app is now available to optimise road reinstatement works
March 10, 2021 Read time: 1 min
A new app is available for checking air voids in reinstated road surfaces

It has been developed by regional water firm United Utilities to improve the job of laying asphalt after roads have been dug up to carry out repairs.

The app addresses the tricky task of measuring and controlling the amount of air contained within the final reinstatement.

According to United Utilities, most technical elements of highway reinstatement can be controlled by skilled operatives, except air void levels. This is an area that is almost impossible to control and measure while teams are working onsite and instead, it is usually tested retrospectively after the asphalt has been laid, through sampling and testing. But this approach is time consuming and inefficient.

The firm developed the easy-to-use app for teams to use during reinstatement. After answering a series of questions and following specific instructions, the tool calculates the air voids in the asphalt that has been laid.

Results from initial two months' usage showed teams using the app achieved 100% compliance from their work and much improved air void levels.

Related Content

  • New tests, new technology, new users: why materials testing is a growing market
    February 7, 2017
    A look back at some of the developments this year, and a look ahead to what may come next reveals the increasing use of materials testing. New technology and new ways to process and analyse data will drive change even further - Kristina Smith reports For materials testing equipment manufacturers, constant change is business as usual. New tests emerge, new standards are written and new practices spread around regions and the world. There are also new materials to deal with: bitumen modified with polymers
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Bitumen technology: three ways to more sustainable roads
    May 14, 2020
    This issue we look at three case studies showcasing new technologies designed to deliver more sustainable paving solutions.