Skip to main content

One Wirtgen W210i follows another for UK firm MAC Surfacing

UK hire company MAC Surfacing has purchased its second Wirtgen W210i large milling machine following significant demand for heavy-duty 2m planers from its customer base. MAC Surfacing, based in the Midlands of England, offers an extensive fleet of pavers and planers plus a full range of ancillary surfacing plant including: rollers, sweepers and JCB 3CX Compact Streetmasters. It also provides skilled labour - from drivers and screwmen to project teams - ranging from two-man preparation crews through to ei
October 24, 2016 Read time: 2 mins
Wirtgen’s W210i large milling machine
UK hire company MAC Surfacing has purchased its second 2395 Wirtgen W210i large milling machine following significant demand for heavy-duty 2m planers from its customer base.

MAC Surfacing, based in the Midlands of England, offers an extensive fleet of pavers and planers plus a full range of ancillary surfacing plant including: rollers, sweepers and 255 JCB 3CX Compact Streetmasters. It also provides skilled labour - from drivers and screwmen to project teams - ranging from two-man preparation crews through to eight-man machine gangs.

The new Wirtgen W210i follows the purchase just six months ago of the company’s first W210i model.

“Purchasing the first 210i model was a major step for us - into a previously untested market,” said MAC Surfacing director Marc Copson. “It has proved extremely popular with medium and large contractors working on major carriageway work. This larger, heavy duty equipment is a natural extension to our fleet.”

Weighing in at 29,150kg, and with a maximum engine power of 537kW, courtesy of two US Tier 4f/EC Stage 4 compliant 196 Cummins engines, the Wirtgen 210i strikes the balance between optimum milling performance and low fuel consumption. The new MAC models can plane depths from 0-330mm and at speeds of 0-85m/min.

Features include a Parallel-to-Surface alignment system, Intelligent Speed Control for improved traction and the innovative Dual Engine Concept. This system in the planer sector accurately matches engine output to the requirements of each job to minimise fuel consumption and subsequent operating costs for contractors.

Wirtgen machines also have adopted the Vacuum Cutting System which reduces the amount of airborne particles produced by the milling process – improving visibility while protecting the machine’s engine and operator.

For more information on companies in this article

Related Content

  • Terex Construction’s next-generation site dumpers feature JCB engines
    February 16, 2015
    Terex Construction’s Stage IIIB/Tier 4 Final-compliant range of 9tonne and 10tonne site dumpers will feature 55kW JCB EcoMAX turbo-charged diesel engines. The company says the new TA9 and TA10 models offer users increased fuel efficiency without any exhaust after-treatment requirements. “Launching this first-to-market range of Stage IIIB/ Tier 4 Final-compliant nine and ten tonne site dumpers is an exciting move for Terex Construction,” says Neal Nowick, general manager of Terex Construction’s Coventry fa
  • Terex Construction’s next-generation site dumpers feature JCB engines
    January 6, 2017
    Terex Construction’s Stage IIIB/Tier 4 Final-compliant range of 9tonne and 10tonne site dumpers will feature 55kW JCB EcoMAX turbo-charged diesel engines. The company says the new TA9 and TA10 models offer users increased fuel efficiency without any exhaust after-treatment requirements. “Launching this first-to-market range of Stage IIIB/ Tier 4 Final-compliant nine and ten tonne site dumpers is an exciting move for Terex Construction,” says Neal Nowick, general manager of Terex Construction’s Coventry fa
  • Terex Construction’s next-generation site dumpers feature JCB engines
    February 16, 2015
    Terex Construction’s Stage IIIB/Tier 4 Final-compliant range of 9tonne and 10tonne site dumpers will feature 55kW JCB EcoMAX turbo-charged diesel engines. The company says the new TA9 and TA10 models offer users increased fuel efficiency without any exhaust after-treatment requirements. “Launching this first-to-market range of Stage IIIB/ Tier 4 Final-compliant nine and ten tonne site dumpers is an exciting move for Terex Construction,” says Neal Nowick, general manager of Terex Construction’s Coventry fa
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance