Skip to main content

Novel drainage solution from REHAU

A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU. This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles. The idea of the system is to prevent flooding close to buildin
July 6, 2016 Read time: 2 mins
A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU.

This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles.

The idea of the system is to prevent flooding close to buildings and allowing the water to be carried away elsewhere to a point where it can be disposed of without problems. The units can be laid in a trench, lined with a geomembrane and even in the event of heavy rainfall, will allow the water to be contained and channelled safely away.

Related Content

  • Engine firms delivering innovative solutions for reducing emissions and fuel consumption
    March 8, 2014
    Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards.
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • Bitumen technology: from potholes to PMB plants
    November 21, 2014
    This month we look at how warm mix is helping to pave dirt roads, a new way to tackle potholes, and bring news of a new distribution centre for the UK - Kristina Smith reports The creation of a new mix design, incorporating MWV’s warm mix additive Evotherm, is providing cost-effective solutions for dirt roads in the US’s Charleston County. The first stretch to be paved with the new porous paving in April this year, Joseph White Road in the town of Adams Run, resulted in the estimated US$1.1 million construc