Skip to main content

Novel drainage solution from REHAU

A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU. This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles. The idea of the system is to prevent flooding close to buildin
July 6, 2016 Read time: 2 mins
A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU.

This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles.

The idea of the system is to prevent flooding close to buildings and allowing the water to be carried away elsewhere to a point where it can be disposed of without problems. The units can be laid in a trench, lined with a geomembrane and even in the event of heavy rainfall, will allow the water to be contained and channelled safely away.

Related Content

  • The environmental case for geosynthetics
    August 8, 2022
    Huesker, a global manufacturer of geosynthetics and technical textiles, explains how incorporating geosynthetic material can boost a project’s environmental credentials*.
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • New asphalt compaction technologies boost quality
    February 28, 2012
    More sophisticated compaction technologies are now coming to market, offering a wide range of benefits to users