Skip to main content

Noise mapping using Dynamic Search

Braunstein + Berndt has released a new SoundPLAN version, SoundPLAN 7.0, and a main feature of this is the new calculation core employing the Dynamic Search scanning method. This, according to the company, makes it possible to calculate anything, no matter how complex the geometry and no matter what size the project.
March 1, 2012 Read time: 2 mins
Braunstein + Berndt has released a new 334 SoundPLAN version, SoundPLAN 7.0, and a main feature of this is the new calculation core employing the Dynamic Search scanning method.
This, according to the company, makes it possible to calculate anything, no matter how complex the geometry and no matter what size the project.

"It is a real breakthrough in noise control software. It was used to map Germany's railroads and would be equally useful to map all the roads in any country," says Braunstein + Berndt.

Noise modelling software is required to model noise from source to receiver and to accurately and concisely document the findings.

Dynamic Search estimates the contribution for each receiver and ranks the influence of all sources. Only the sources important to the final result of a receiver are calculated: the rest are estimated. By dynamically selecting the sources that need to be calculated versus estimated, more data can be calculated more quickly than was ever thought possible.

"This new method was used to successfully complete the world's largest noise map, the END noise mapping of the railways throughout Germany in which 12,000km of railway were mapped, and this included 11GB of terrain information, 8 million buildings and 36 million receiver points. All of this was calculated on four personal computers in less than 30 days running time using 32?bit WindowsXP," says Braunstein + Berndt.

The mapping was conducted by PÖYRY and the database and viewer were supplied by Intergraph.

For more information on companies in this article

Related Content

  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport
  • Implementing road user charging
    February 14, 2012
    Oregon Department of Transportation's James Whitty spoke with Jason Barnes on the state's progress with VMT fee-based charging