Skip to main content

Noise mapping using Dynamic Search

Braunstein + Berndt has released a new SoundPLAN version, SoundPLAN 7.0, and a main feature of this is the new calculation core employing the Dynamic Search scanning method. This, according to the company, makes it possible to calculate anything, no matter how complex the geometry and no matter what size the project.
March 1, 2012 Read time: 2 mins
Braunstein + Berndt has released a new 334 SoundPLAN version, SoundPLAN 7.0, and a main feature of this is the new calculation core employing the Dynamic Search scanning method.
This, according to the company, makes it possible to calculate anything, no matter how complex the geometry and no matter what size the project.

"It is a real breakthrough in noise control software. It was used to map Germany's railroads and would be equally useful to map all the roads in any country," says Braunstein + Berndt.

Noise modelling software is required to model noise from source to receiver and to accurately and concisely document the findings.

Dynamic Search estimates the contribution for each receiver and ranks the influence of all sources. Only the sources important to the final result of a receiver are calculated: the rest are estimated. By dynamically selecting the sources that need to be calculated versus estimated, more data can be calculated more quickly than was ever thought possible.

"This new method was used to successfully complete the world's largest noise map, the END noise mapping of the railways throughout Germany in which 12,000km of railway were mapped, and this included 11GB of terrain information, 8 million buildings and 36 million receiver points. All of this was calculated on four personal computers in less than 30 days running time using 32?bit WindowsXP," says Braunstein + Berndt.

The mapping was conducted by PÖYRY and the database and viewer were supplied by Intergraph.

For more information on companies in this article

Related Content

  • Groundbreaking calculator of greenhouse gas emissions
    February 9, 2012
    Time for CHANGER IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing.
  • Groundbreaking calculator of greenhouse gas emissions
    April 12, 2012
    IRF launches CHANGER, a groundbreaking calculator of greenhouse gas emissions from road construction. Our world is changing, our climate is changing. Industry too is changing to meet the new social, environmental and economic challenges of our times. Already, the road sector has taken a decisive lead in this respect by transforming its practices and adopting new, more eco-friendly techniques and technologies. CHANGER is the latest flagship project in this evolution: the sign of an indust
  • How data mining and the intelligence it creates is helping sites run more effectively and efficiently
    December 13, 2022
    In this, the third in our series of top-level roundtable discussions led by World Highways, editor Mike Woof and roundtable host Nadira Tudor talk machine control technology with three world-class experts from Leica Geosystems (part of Hexagon), Topcon, and Trimble. There’s never been a more exciting time to be in construction as innovation makes us more productive, more efficient, more sustainable, and better connected. Autonomy means opportunity.
  • Road markings and microplastics
    February 2, 2024
    Recent regulations from the European Commission have exempted road markings from microplastic bans and restrictions, at least for the moment, explains to the ERF.