Skip to main content

No parking here

In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the ti
August 15, 2013 Read time: 1 min
In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the time and effort to paint the yellow lines is unclear but perhaps the contractor had some leftover paint and a few minutes to spare in between more necessary jobs.

Related Content

  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance
  • Driving recycling, unlocking the value of UK roads
    May 16, 2016
    Concerned about the risk of material failure, many local authorities and network operators have been reluctant to incorporate high recycled content asphalt into the surface course of UK roads. David Smith, development director at FM Conway, explained why asphalt recycling is crucial to maximising the value of Britain’s largely untapped road asset.
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo