Skip to main content

No parking here

In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the ti
August 15, 2013 Read time: 1 min
In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the time and effort to paint the yellow lines is unclear but perhaps the contractor had some leftover paint and a few minutes to spare in between more necessary jobs.

Related Content

  • New machines boost concrete paving performance and accuracy
    July 21, 2015
    New concrete paving machines offer greater versatility as well as performance – Mike Woof writes GOMACO said that its Next Generation Commander III paver has been designed to increase safety and all-round visibility, while offering improved performance. This four track paver benefits from the firm’s latest G+ Connect technology as well as 3D guidance options. A key to the improved performance is the G+ control system while the machine also has power from a quiet, low-emission Tier 4 engine. Fuel consumption
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public