Skip to main content

No parking here

In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the ti
August 15, 2013 Read time: 1 min
In the UK, double yellow lines painted close at the kerbside denote an area where parking is not allowed. But in the city of Cambridge the authorities have decided to paint double yellow lines just 307mm long in between two parking bays. The space is barely large enough to park a radio-controlled car or to slot in a bicycle, let alone a motor vehicle, but the city’s authorities have nevertheless decided that it is important to denote the area is not to be used. Quite why it was felt necessary to take the time and effort to paint the yellow lines is unclear but perhaps the contractor had some leftover paint and a few minutes to spare in between more necessary jobs.

Related Content

  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • The “rollercoaster in the dunes”: Circuit Park Zandvoort
    June 14, 2021
    Some projects are so specialist that there are hardly any construction companies with significant experience to draw on - another reason why it is so valuable to have a partner with the expertise and experience to take things forward. The rehabilitation and modification of the race track in Zandvoort was a project like this.
  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • Developments in the concrete pavers market
    February 20, 2012
    The market for concrete pavers continues to fuel research and development into new models writes Mike Woof. The range and breadth of concrete slipforming and paving equipment on the market continues to grow as firms develop new and improved models. Prior to the recent CONEXPO-CON/AGG 2011 construction equipment show in Las Vegas, some of the best known manufacturers had already announced their new and improved slipforming machines. GOMACO, Guntert & Zimmermann, Power Curbers and Wirtgen all had recent or ne