Skip to main content

New self propelled drill from Sandvik

Sandvik introduced its new Tiger range of top hammer drills at bauma 2014 in Shanghai, China. With a low centre of gravity and track driven the Tiger offers stability and high stability on uneven terrain. The DG700 and DG800, the two models currently launched, are designed with road cutting, pipeline drilling, foundation drilling, and production drilling in mid-sized quarries applications in mind. Crucial to their utility is the Sandvik rock drills which are coupled to a fixed boom and rod-handling syst
January 6, 2017 Read time: 2 mins
The new Sandvik Tiger drills give high penetration rates and are available with Tier 3 compliant engines
325 Sandvik introduced its new Tiger range of top hammer drills at bauma 2014 in Shanghai, China. With a low centre of gravity and track driven the Tiger offers stability and high stability on uneven terrain. The DG700 and DG800, the two models currently launched, are designed with road cutting, pipeline drilling, foundation drilling, and production drilling in mid-sized quarries applications in mind.

Crucial to their utility is the Sandvik rock drills which are coupled to a fixed boom and rod-handling system. The rock-drilling control system not only ensures high productivity rates for penetration but also smooth collaring, prolonging service life, and giving better hole quality.

Drilling is controlled by a joystick in the cab. The cabin is soundproofed to keep noise level well below 85dBA and it is ROPS and FOPS certified.

Power for the Tiger series comes from a 179kW Tier 2 engine. Maintenance is made easier by components that are easy to reach in addition to ground-level daily service points.

Both models weigh in at 14.7 tonnes. The main difference is the rock drill. An HL710 19.5kW unit is fitted to the DG700. This allows drilling of holes with a diameter of 64-115mm giving a production capacity of up to a million tonnes per year. Flushing air is 8.1m3/min at up to 10 bar. The DG800 comes with a HL810T21kW drill to give holes of between 64 and 127mm. Production capacity is 1.1 million tonnes per year and flushing air is  9.6m3/min also at up to 10 bar. Both models can have 38, 45 or 51mm rock tools.

For more information on companies in this article

Related Content

  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Cat unveils the well-drilled MD5150C
    May 22, 2014
    Caterpillar’s new MD5150C Track Drill, the first of the C Series drills, delivers claimed top-of-class power and high airflow for fast, efficient drilling of holes from 101.6mm to 152mm in diameter. The MD5150C offers a choice of three different rock drills, patented carousel rod changer, ergonomic cab and many other features that boost productivity and reduce operating costs.
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US