Skip to main content

New Rammer hammer for extreme use

Sandvik launched a new hydraulic hammer under its Rammer brand at bauma 2014 in Shanghai, China. The 3,750kg Rammer 4099 PRO is designed for carriers in the 34-55 tonne weight class. Based on the field-proven Rammer 4099 the new model is for extreme operating conditions such as underground. It has a sealed housing to prevent ingestion of dust and dirt so prolonging the life of the hammer and tool. There are sealed through apertures for hydraulic hoses, water, air and grease. It has been designed with
November 27, 2014 Read time: 2 mins
Rammer’s 4099 PRO breaker is designed for extreme duty applications such as tunnelling
325 Sandvik launched a new hydraulic hammer under its 5076 Rammer brand at bauma 2014 in Shanghai, China. The 3,750kg Rammer 4099 PRO is designed for carriers in the 34-55 tonne weight class.

Based on the field-proven Rammer 4099 the new model is for extreme operating conditions such as underground. It has a sealed housing to prevent ingestion of dust and dirt so prolonging the life of the hammer and tool. There are sealed through apertures for hydraulic hoses, water, air and grease.

It has been designed with horizontal working in mind and so features a sturdy housing design, fully supported power cell, high resistant wear plates, and top buffer design.

To aid tunnelling applications the Rammer 4099 PRO is available with the AGW Unit. This consists of systems to protect the hammer and lower operating costs. The Ramair air flush system prevents potentially harmful dust ingress. The Ramlube I system ensures consistent and thorough lubrication. To minimise dust during breaking there is the Water Jet package. The AGM unit is hydraulically actuated and doesn't require an additional power source.

Impact rate on long strokes is 360-560bpm and on short strokes 540-670bpm. Operating pressure is 135-145 bar and tool diameter is 166mm.

For more information on companies in this article

Related Content

  • Okie hammer home advantage with Sandvik RH550
    January 24, 2014
    Although Okie Drilling’s flexibility enables the firm based in Stigler in the US state of Oklahoma to undertake a diverse variety of drilling projects, it core business is drilling for rock quarries and state road projects. According to Okie president Billy White, the cornerstones of Okie’s success in meeting the requirements of these demanding sectors is employees willingness to go the “extra yard” for customers, and the service and products he receives from Sandvik Construction’s Rock Tools & Drilling tea
  • Hillhead-line acts for 2014 show
    July 2, 2014
    The 2014 edition of Hillhead, the three-day biennial flagship show for the quarrying, recycling and heavy construction industries, is set to welcome thousands of visitors, keen to see the latest leading equipment models alongside innovative machine and site management control technology. Guy Woodford reports on what a variety of major companies will be showcasing during this month’s show at Lafarge Tarmac’s Hillhead Quarry near Buxton in Derbyshire With around 450 UK and international suppliers of plant, eq
  • New asphalt recycler from IROCK
    September 26, 2013
    IROCK says that its RDS-15 mobile crusher suits duties in recycled asphalt applications. This horizontal impact crushing plant is said to be highly mobile and versatile. The rapid deployment system (RDS) the firm has developed is said to increase transportability from site to site and cut set-up times when the equipment arrives on-site. The RDS-15 is said to be ideal for processing smaller materials such as reclaimed asphalt pavement (RAP). Versatile and compact, this crushing and screening system provid
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.