Skip to main content

New powder coating plane for Doka

Doka, an Austrian formwork solutions company, has commissioned a new powder-coating plant in St. Martin, close to the company’s corporate headquarters in Amstetten
October 12, 2021 Read time: 2 mins
Automatic, digital and flexible: Doka’s new powder-coating plant selects the right powder application method, such as the robot hand, to suit a client’s needs (image courtesy Doka)

The highly-automated plant “forms part of a multistage expansion of production facilities in St. Martin with a total investment volume of €40 million”.

Doka said the new powder-coating plant consumes 80% less water than the previous plant and uses environmentally friendly chemicals. The use of sophisticated technologies also permits the plant to save energy in the operation of the furnaces.

"The plant design was inspired by the notion of maximum flexibility," said Christian Mayr, Doka’s vice president of production. A major new feature is that even the larger components of the Doka Framax product range can be powder-coated in the near future. This also means that small series, in addition to large-scale series, can now be produced quickly and economically. The new powder-coating plant adds a real touch of colour, with frame elements able to be painted according to client wishes, such as in corporate colours.

Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)
Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)

Due to the high level of automation and digitisation in the production process, the range can even be produced in Austria at competitive prices. The plant is currently being ramped up to run as a single-shift operation. The company also plans to make the plant available for contract manufacturing in the future.

The commissioning coincides with Robert Hauser taking over as chairman of the company. Hauser joined the company in 2018 and has been a board member for the Middle East & Africa and East Asia & Pacific regions since last year. He moved from Dubai for the new position and takes over from Harald Ziebula who is retiring from Doka after 21 years. He intends to accelerate Doka’s digitalisation in the sense of intelligent methods and efficient processes.

Prior to joining Doka, Hauser was employed by the industrial services provider Bilfinger SE where his responsibilities included the Scaffolding division. Before Belfinger, he worked at scaffolding provider Peri for 12 years.  

For more information on companies in this article

Related Content

  • Bitumen tech: innovation for decarbonisation
    June 4, 2024
    Kristina Smith examines four new products and processes, including bio-bitumen produced from algae, designed to lower the carbon footprint of asphalt mixes.
  • Massenza’s bespoke solution for desert emulsion plant
    July 4, 2023
    In late 2022, one of Massenza’s long-standing customers approached the bitumen equipment manufacturer with a special request: it needed a high-capacity emulsion plant which would be located in a remote area of the Middle East. Additionally, the plant needed enhanced levels of flexibility, security and safety.
  • Enerpac’s SL100 floats like a butterfly
    July 22, 2020
    An Enerpac SL100 gantry mounted on a pontoon recently provided a stable lift for a 48tonne bridge deck in the Netherlands.
  • Multitask additive B2last® for road pavement from BASF
    September 1, 2023
    In 2020, BASF launched their brand-new additive for warm mix asphalt, B2Last®, a new liquid modifier in both Europe and in the USA. By chemically modifying the asphalt binder, BASF developed an innovative solution for the paving industry. After nearly four years of field usage and trials in different regions, B2Last has proven to be an efficient and cost-effective way to modify bitumen.