Skip to main content

New powder coating plane for Doka

Doka, an Austrian formwork solutions company, has commissioned a new powder-coating plant in St. Martin, close to the company’s corporate headquarters in Amstetten
October 12, 2021 Read time: 2 mins
Automatic, digital and flexible: Doka’s new powder-coating plant selects the right powder application method, such as the robot hand, to suit a client’s needs (image courtesy Doka)

The highly-automated plant “forms part of a multistage expansion of production facilities in St. Martin with a total investment volume of €40 million”.

Doka said the new powder-coating plant consumes 80% less water than the previous plant and uses environmentally friendly chemicals. The use of sophisticated technologies also permits the plant to save energy in the operation of the furnaces.

"The plant design was inspired by the notion of maximum flexibility," said Christian Mayr, Doka’s vice president of production. A major new feature is that even the larger components of the Doka Framax product range can be powder-coated in the near future. This also means that small series, in addition to large-scale series, can now be produced quickly and economically. The new powder-coating plant adds a real touch of colour, with frame elements able to be painted according to client wishes, such as in corporate colours.

Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)
Doka’s new chief executive, Robert Hauser: more digitalisation (image courtesy Doka)

Due to the high level of automation and digitisation in the production process, the range can even be produced in Austria at competitive prices. The plant is currently being ramped up to run as a single-shift operation. The company also plans to make the plant available for contract manufacturing in the future.

The commissioning coincides with Robert Hauser taking over as chairman of the company. Hauser joined the company in 2018 and has been a board member for the Middle East & Africa and East Asia & Pacific regions since last year. He moved from Dubai for the new position and takes over from Harald Ziebula who is retiring from Doka after 21 years. He intends to accelerate Doka’s digitalisation in the sense of intelligent methods and efficient processes.

Prior to joining Doka, Hauser was employed by the industrial services provider Bilfinger SE where his responsibilities included the Scaffolding division. Before Belfinger, he worked at scaffolding provider Peri for 12 years.  

For more information on companies in this article

Related Content

  • Bonjour bio-based binders
    April 5, 2023
    How can Shell speed the whole road construction sector on its way to decarbonisation? Professor John Read and Richard Taylor have a few ideas.
  • Digital transformation with production system solutions from Wirtgen Group
    May 24, 2024

    Maximising a machine’s uptime, allocation of resources the most efficient way, completing projects on schedule and ensuring the quality of results are nowadays major factors that decide whether a company can run its business successfully or not. This is amplified by the fact that the labor-intensive construction sector is affected by a global shortage of skilled workforce like few other industries and has to meet far-reaching requirements for quality, documentation, and sustainability.

  • Efficient Load Out: the digital solution revolutionising mass excavation projects
    November 15, 2021
    Staying connected to customers and colleagues has never been more important and over the last two years, adoption of innovative technologies that enable this has accelerated in businesses in every sector around the world. And for Volvo Construction Equipment, the construction site is no different. Efficient Load Out is a digital solution which connects machine operators, truck drivers and site managers in real-time to maximise the profitability and sustainability of mass excavation projects
  • Doka delivers on the Nawaseeb Road
    June 29, 2021
    The Nawaseeb Road in Kuwait forms an important part of the country's national infrastructure, providing a strategic, logistical corridor to neighbouring Saudi Arabia