Skip to main content

New plants for Romania’s asphalt needs

Benninghoven ECO and TBA mixing plants are operating at different locations in Romania. These plants will help the country achieve its aim of improving its road network and extending the total highway distance from 750km to 2,710km, with 223km currently under construction.
October 30, 2020 Read time: 2 mins
Benninghoven has supplied asphalt plants to a number of customers in Romania

In the west of Romania, SDM Timisoara replaced an existing asphalt mixing plant. SDM requires asphalt primarily for rehabilitation projects in and around Timisoara. The decision in terms of plant technology was eventually made in favour of an ECO 2000 transportable asphalt mixing plant in a container design. Of note is that the ECO 2000 in Timisoara is orange to meet the client’s request, which Benninghoven was able to meet due to its new powder-coating facility.

Meanwhile, a ECO 2000 transportable asphalt mixing plant in a container design was also recently commissioned in the north of Romania to replace an old plant. A novel feature is that it is located in the middle of a nature reserve in one of the most beautiful regions of the country. Local authority conditions were correspondingly stringent. However, the proven EVO JET burners from Benninghoven met the strict requirements on efficiency. Featuring the latest frequency control technology, emissions are aid to be minimal.

A third Benninghoven mixing plant, TBA 2000, has recently started producing high quality asphalt in Blejoi, about 50km north of the capital Bucharest.  

Benninghoven's transportable plants (or TBA for short) cover a capacity range from 160-320tonnes/hour and are suited to both semi-mobile and stationary applications. The asphalt mix from this plant is not stored, but is mixed and loaded directly to order.

The design of the plant means that as many formulas as the customer wishes can be entered and managed. The mixing supervisor of the TBA 2000 in Blejoi can react to delays in operations by splitting orders into part-orders or interrupting orders to give priority to others. The residual quantity is then stored automatically and taken into account when the order in question is resumed.

For more information on companies in this article

Related Content

  • Ammann asphalt plant for UAE road construction
    October 5, 2018
    An asphalt plant supplied by Ammann is now playing an important role in the UAE’s road construction sector The plant is producing material for major new road projects in the UAE. “We need to produce quality asphalt, and high volumes of it,” said Adnan Elmasri, operations manager for Top Link Contracting & General Transportation, based in Dubai. Top Link, a major contractor in Abu Dhabi and Dubai, is providing mix for a new highway that will help to reduce the current traffic congestion issues occurring
  • Efficient new asphalt compactors from leading firms
    March 12, 2014
    New asphalt compactors from leading firms offer greater versatility and lower running costs - Mike Woof writes
  • Ammann is widening the range of its Elba concrete plants
    February 10, 2015
    Ammann continues to invest in the Elba concrete plant business it acquired during 2014. Fruit of this can be seen in the expanding product range, with the introduction of the new ECC Elba Concrete Centre.
  • Ammann is widening the range of its Elba concrete plants
    January 6, 2017
    Ammann continues to invest in the Elba concrete plant business it acquired during 2014. Fruit of this can be seen in the expanding product range, with the introduction of the new ECC Elba Concrete Centre.