Skip to main content

New plants for Romania’s asphalt needs

Benninghoven ECO and TBA mixing plants are operating at different locations in Romania. These plants will help the country achieve its aim of improving its road network and extending the total highway distance from 750km to 2,710km, with 223km currently under construction.
October 30, 2020 Read time: 2 mins
Benninghoven has supplied asphalt plants to a number of customers in Romania

In the west of Romania, SDM Timisoara replaced an existing asphalt mixing plant. SDM requires asphalt primarily for rehabilitation projects in and around Timisoara. The decision in terms of plant technology was eventually made in favour of an ECO 2000 transportable asphalt mixing plant in a container design. Of note is that the ECO 2000 in Timisoara is orange to meet the client’s request, which Benninghoven was able to meet due to its new powder-coating facility.

Meanwhile, a ECO 2000 transportable asphalt mixing plant in a container design was also recently commissioned in the north of Romania to replace an old plant. A novel feature is that it is located in the middle of a nature reserve in one of the most beautiful regions of the country. Local authority conditions were correspondingly stringent. However, the proven EVO JET burners from Benninghoven met the strict requirements on efficiency. Featuring the latest frequency control technology, emissions are aid to be minimal.

A third Benninghoven mixing plant, TBA 2000, has recently started producing high quality asphalt in Blejoi, about 50km north of the capital Bucharest.  

Benninghoven's transportable plants (or TBA for short) cover a capacity range from 160-320tonnes/hour and are suited to both semi-mobile and stationary applications. The asphalt mix from this plant is not stored, but is mixed and loaded directly to order.

The design of the plant means that as many formulas as the customer wishes can be entered and managed. The mixing supervisor of the TBA 2000 in Blejoi can react to delays in operations by splitting orders into part-orders or interrupting orders to give priority to others. The residual quantity is then stored automatically and taken into account when the order in question is resumed.

For more information on companies in this article

Related Content

  • Smart Astec plant for Florida firm
    August 18, 2015
    US-based P&S Paving has boosted output from its asphalt facility in Daytona, Florida with the purchase of a new plant from Astec Industries. The firm supplies a wide range of customers ranging from small urban works up to large highway projects for the Florida Department of Transportation. As a result the company needed a modern, versatile and productive plant capable of delivering an array of mixes and quantities, including high quality materials. Tim Phillips, president of P&S Paving said, “We want
  • New powder coating plane for Doka
    October 12, 2021
    Doka, an Austrian formwork solutions company, has commissioned a new powder-coating plant in St. Martin, close to the company’s corporate headquarters in Amstetten
  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a
  • Asphalt: checking properties
    July 18, 2012
    Specialist equipment is available for carrying out a variety of important tests on asphalt It is important to know how asphalt will react to various conditions such as heat, cold and traffic loads when it is laid on roads. Project specifications will give detailed criteria of what is required, and companies will either ask outside laboratories to make sure the material meets the specs, or will often carry out such tests themselves with trained staff in an on-site laboratory. This will be equipped with the