Skip to main content

New plants for Romania’s asphalt needs

Benninghoven ECO and TBA mixing plants are operating at different locations in Romania. These plants will help the country achieve its aim of improving its road network and extending the total highway distance from 750km to 2,710km, with 223km currently under construction.
October 30, 2020 Read time: 2 mins
Benninghoven has supplied asphalt plants to a number of customers in Romania

In the west of Romania, SDM Timisoara replaced an existing asphalt mixing plant. SDM requires asphalt primarily for rehabilitation projects in and around Timisoara. The decision in terms of plant technology was eventually made in favour of an ECO 2000 transportable asphalt mixing plant in a container design. Of note is that the ECO 2000 in Timisoara is orange to meet the client’s request, which Benninghoven was able to meet due to its new powder-coating facility.

Meanwhile, a ECO 2000 transportable asphalt mixing plant in a container design was also recently commissioned in the north of Romania to replace an old plant. A novel feature is that it is located in the middle of a nature reserve in one of the most beautiful regions of the country. Local authority conditions were correspondingly stringent. However, the proven EVO JET burners from Benninghoven met the strict requirements on efficiency. Featuring the latest frequency control technology, emissions are aid to be minimal.

A third Benninghoven mixing plant, TBA 2000, has recently started producing high quality asphalt in Blejoi, about 50km north of the capital Bucharest.  

Benninghoven's transportable plants (or TBA for short) cover a capacity range from 160-320tonnes/hour and are suited to both semi-mobile and stationary applications. The asphalt mix from this plant is not stored, but is mixed and loaded directly to order.

The design of the plant means that as many formulas as the customer wishes can be entered and managed. The mixing supervisor of the TBA 2000 in Blejoi can react to delays in operations by splitting orders into part-orders or interrupting orders to give priority to others. The residual quantity is then stored automatically and taken into account when the order in question is resumed.

For more information on companies in this article

Related Content

  • Concrete plants: flexibility and efficiency
    March 17, 2016
    Concrete mixing plants are becoming more flexible and innovative to ensure they meet increasingly stringent construction schedules. Increasing demands are put on contractors to cut down the transportation of material to construction sites in the name of efficiency and the environment. For that reason concrete mixing plants are increasingly flexible in their transportation to sites, their set up times and their output. Ammann Elba, the company created when German-based Elba was acquired by Ammann in 20
  • Concrete plant for Mali contractor
    June 19, 2023
    A contractor in Mali has increased its concrete production capabilities with the addition of a third Eurotec ECO concrete batching plant. The new ECO90 joins the existing ECO30 and ECO50 machines already used by the firm, Z For Mining (ZFM).
  • Ammann’s US asphalt plant
    June 10, 2025


    Ammann has been developing continuous asphalt plant technology for the North American market. The firm has been utilising technology developed for its European batching plants and compact continuous plants in the project to develop a large capacity asphalt plant for North America.

  • Improved PMB plant from Massenza
    March 5, 2025

    Italian firm Massenza has carried out an extensive redesign of its PMB plant line-up. The new generation of PMB plants from the firm includes three models, the compact Smart model, the medium sized Klever and the top-of-the-range Super Klever.