Skip to main content

New bridge under construction in Turkey

Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
March 28, 2014 Read time: 2 mins
Two Potain tower cranes are being used to help construct the Nissibi Bridge in Turkey
The two 5916 Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.

The 10tonne capacity MC235Bs were supplied to the main contactor, 4143 Gulsan, by Potain’s Turkish dealer, Tekno Vinç, the largest tower crane operator in the country. The first Potain MC 235 B was erected at the Nissibi Bridge job site in September 2012, while the second joined in January 2013. Both will be dismantled by July 2014, ahead of the bridge’s opening later this year.

The top-slewing tower cranes are being used to lift general building materials used in traditional cable-stayed bridge construction, such as formwork and steel structures. As construction progresses, the cranes will lift large sections of carrier cables weighing up to 10tonnes.
The two Potain cranes are working at heights of 101m and 104m, and both are rigged with 45m jibs. The cranes are anchored to the bridge’s 96m tall pylons on each riverbank.

The cranes were transported to the job site from their base near Istanbul, more than 1,300km away. Once on site, a ferry was used to transport one crane to the other side of the river.

When it is complete, the Nissibi Bridge will be 24.5m wide and Span 400m across the Euphrates River. Work on the project commenced in July 2012. Established in 1990, Tekno Vinç operates a fleet of more than 100 Potain tower cranes, which it deploys at projects throughout Turkey, while Gulsan is a leading Turkish construction company based in Ankara.

For more information on companies in this article

Related Content

  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.
  • Intermat Middle East positions itself for growth
    October 17, 2012
    As the United Arab Emirates gears up to invest more than US $4.6 billion (UAE Dirham 17 billion) in its nationwide road network in the next few years, the second annual INTERMAT Middle East show has taken place in Abu Dhabi with suppliers like AAA Cranes, Miller UK, Kanoo, Liebherr, Sennebogen, WireCo World, Erkat, Terex Finlay, Atlas Copco, , ELSA SRL, Robit Rock Tools, Ramtec Robi, Scheuerle Fahrzeugfabrik, T.G.S – The Grab Specialist, BV Beco, Techking Tires, Blastrac, SK Solutions, Xcentric Internationa
  • New Thames River bridge crossing proposed for UK capital London
    July 2, 2014
    Plans are once more being put forward for a new bridge spanning the River Thames in East London. The proposed structure is expected to cost in the region of €750 million (£600 million) to build and has been designed by Arup and HOK. The campaign for the new bridge is being led by the London Chamber of Commerce and Industry (LCCI), which says that there is a desperate need for an additional crossing. The campaign group also has the support of City Airport, which lies on the north side of the Thames and would
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia