Skip to main content

New bridge under construction in Turkey

Work is underway on a new bridge structure in Turkey, with tower cranes playing a key role in the project The two Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.
March 28, 2014 Read time: 2 mins
Two Potain tower cranes are being used to help construct the Nissibi Bridge in Turkey
The two 5916 Potain tower cranes are being used to build a 610m long cable-stayed bridge in the south-east of the country. The two cranes are MC235B models and are working 10 hours/day on the project, which is taking 30 months. The new bridge will provide an important connection across the Ataturk Dam Reservoir on the Euphrates River.

The 10tonne capacity MC235Bs were supplied to the main contactor, 4143 Gulsan, by Potain’s Turkish dealer, Tekno Vinç, the largest tower crane operator in the country. The first Potain MC 235 B was erected at the Nissibi Bridge job site in September 2012, while the second joined in January 2013. Both will be dismantled by July 2014, ahead of the bridge’s opening later this year.

The top-slewing tower cranes are being used to lift general building materials used in traditional cable-stayed bridge construction, such as formwork and steel structures. As construction progresses, the cranes will lift large sections of carrier cables weighing up to 10tonnes.
The two Potain cranes are working at heights of 101m and 104m, and both are rigged with 45m jibs. The cranes are anchored to the bridge’s 96m tall pylons on each riverbank.

The cranes were transported to the job site from their base near Istanbul, more than 1,300km away. Once on site, a ferry was used to transport one crane to the other side of the river.

When it is complete, the Nissibi Bridge will be 24.5m wide and Span 400m across the Euphrates River. Work on the project commenced in July 2012. Established in 1990, Tekno Vinç operates a fleet of more than 100 Potain tower cranes, which it deploys at projects throughout Turkey, while Gulsan is a leading Turkish construction company based in Ankara.

For more information on companies in this article

Related Content

  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • BAUER involved in constructing a tunnel under the Suez Canal
    October 4, 2016
    The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for