Skip to main content

New Allu 3D positioning system for mass stabilisation

The new Allu 3D positioning system at CONEXPO is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.
January 28, 2014 Read time: 1 min
The new 2180 ALLU 3D positioning system at Conexpo is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.

The Finnish company says the new system eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell/block in mass stabilisation.

The positioning system can be mounted on every old and new ALLU stabilisation system, a process which is carried out by feeding dry powder such as binder from a pressure feeder via a hose to the ALLU PMX mixing head mounted on an excavator. The mixing head can then be positioned to the right place on the work area with the help of the new system.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.allu.net Allu Website false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

For more information on companies in this article

Related Content

  • Verco buckets up to extreme condition mining
    April 9, 2013
    Verco has been supplying buckets for mining in extreme conditions for more than 25 years. Proud members of the HARDOX WEARPARTS network, and with products boasting the logo HARDOX IN MY BODY, Verco specialises in the production of bucket for big excavators and wheeled loaders. The firm also produces wear parts, liners for crushers and recycling equipment.
  • Innocrush offers its new Innodrive system
    February 12, 2013
    Austrian mobile crushing and screening equipment manufacturer, Innocrush says its team is constantly striving to develop new and innovative systems that enable customers to achieve the maximum profit with their machines. In 2011 the company presented the dsb Innocrush Innodrive in which the equipment is driven directly without coupling and thus no wear or maintenance-intensive components, says Innocrush.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als