Skip to main content

New Allu 3D positioning system for mass stabilisation

The new Allu 3D positioning system at CONEXPO is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.
January 28, 2014 Read time: 1 min
The new 2180 ALLU 3D positioning system at Conexpo is made up of four modules: computer unit with software; touch-screen; base station and GPS antennas utilising GPS signals.

The Finnish company says the new system eases the mixing work and at the same time ensures homogenous mixing results and accurate binder feeding on each cell/block in mass stabilisation.

The positioning system can be mounted on every old and new ALLU stabilisation system, a process which is carried out by feeding dry powder such as binder from a pressure feeder via a hose to the ALLU PMX mixing head mounted on an excavator. The mixing head can then be positioned to the right place on the work area with the help of the new system.
%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 48325 0 oLinkExternal www.allu.net Allu Website false /EasySiteWeb/GatewayLink.aspx?alId=48325 false false%>

For more information on companies in this article

Related Content

  • CEI enters concrete plant market
    January 29, 2014
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.
  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • CTE develops new high reach access platform
    January 6, 2017
    A new platform line has been launched by CTE, the B-Lift 390 High Range, a truck-mounted high range telescopic platform which is able to meet the requirements of various markets. The platform reaches 39 m of working height with 26.3m of maximum outreach and 450kg of maximum loading capacity. It has a telescopic boom (4 elements) with main boom and 3 telescopic extensions and H stabilisation system.