Skip to main content

Morocco extraction site service capability

Phosphate extraction is carried out on a huge scale in Morocco in harsh, hot and often remote locations. Servicing this equipment is no easy task given the conditions, with special machines having to be used. Phosphate is in high demand. It is used in fertilizer, detergent and food additives. However its fastest growing market is in the manufacturing of lithium-ion batteries, now being used widely for commercial goods as well as electric vehicles. As Morocco is the world's third-largest producer of phosphat
July 15, 2016 Read time: 4 mins

 Phosphate extraction is carried out on a huge scale in Morocco in harsh, hot and often remote locations. Servicing this equipment is no easy task given the conditions, with special machines having to be used


Phosphate is in high demand. It is used in fertilizer, detergent and food additives. However its fastest growing market is in the manufacturing of lithium-ion batteries, now being used widely for commercial goods as well as electric vehicles. As Morocco is the world's third-largest producer of phosphates, after the US and China, this has given its economy a major boost.
State-owned Office Chérifien des Phosphates (OCP) is the world’s leading producer of phosphate rock and in 2013 it had revenues of US$ 4.64 billion, making it a sizeable contributor to the country’s GDP.
And OCP is also sitting on the largest reserves of phosphate rock in the world too, about 85,000 million tonnes according to the United States Geological Survey (USGS).
Located 70km north of Marrakesh, Benguérir, like all OCP’s phosphate mines, is an open pit operation. It operates 24 hours/day in three shifts, employing about 775 people. Production at Benguérir’s six benches is carried out using the drill-and-blast method. Once blasting has occurred the waste is stripped by draglines and the phosphate is then loaded by electric shovel or wheeled loader onto trucks for haulage to the mine’s primary crusher for initial processing.
The mine’s current equipment fleet is comprised of six draglines and two electric shovels. There are also two large wheeled loaders, six drill rigs, 22 rigid dump trucks from 75-150tonne capacity, 24 bulldozers, three graders and three water spray trucks onsite.
Given the enormous size of many of these machines, servicing is mainly done in the field. Until 2015, tools, parts and service personnel travelled from one machine to another using a flatbed, on-road truck. But the mine’s harsh conditions and rough terrain were too difficult for the truck to cope with.
Looking for a more robust solution, in early 2014 OCP approached Volvo Construction Equipment’s Casablanca-headquartered dealer, Volvo Maroc. After careful deliberation and extensive consultations two modified A30F haulers were chosen. The haul truck chassis and frame is a standard solution from the factory, however the service unit had to be built to order.
The chassis was built in Sweden, with a local partner in Casablanca, Remorques Equipement, providing the box on the back. Equipment onboard includes a small crane, a compressor, a welding set, equipment for performing oil changes, tanks containing various oils and water, greasing equipment, and a workbench.
The design of the modified ADTs was a collaborative effort, with OCP, Volvo CE and Remorques Equipement all having input. According to Volvo CE, OCP provided a technical specification of what it wanted. Volvo CE then worked with the local supplier to make sure this would fit and the haulers could carry the load. As part of OCP’s original specification both haulers were also equipped with a fire suppression system.
Delivery was originally scheduled for April 2015, but as the project developed and the requirements from OCP became ever more complex, delivery was pushed back to June. The two haulers are now operating at the Benguérir and the Youssoufia mines.
Besides the two haulers, Volvo CE also provided training for the operators and technicians as part of its Customer Care package. The technicians received four days' training with a trainer who came over from France especially, and Volvo Maroc will provide all servicing up to 5,000 hours, or 18 months, with a check every 1,000 hours.  
The two A30Fs are the first machines Volvo CE has supplied to OCP and the firm is hopeful that there will be more. The company is now on a list of OCP approved suppliers, so can submit for other tenders, which it has been doing.

Related Content

  • Hitachi machines productive in West African quarry
    March 21, 2016
    Two Hitachi ZX350LCH-3Gs recently acquired by West African company Logistics Support Services (LSS) are proving invaluable assets to operations at the Arigu Rock quarry, located close to Tamale in northern Ghana. The medium Zaxis-3 excavators are working across the 18ha site to excavate granite materials for use in road construction and concrete works, among others. Acquired in early 2015 by LSS, the Arigu Rock quarry holds enough materials to sustain an operation for over 50 years. The site’s 24 employees
  • LiuGong opens its first overseas school training in Morocco
    July 15, 2016
    LiuGong has now opened its first overseas school training centre cooperation opened in Casablanca. Part of OFPPT (Morocco Vocational Training and Labour Council) the school was founded to meet the needs of its national human development strategy. This is a national training institution set up by the Morocco Government and supplies free professional training for more than 110,000 students/year. The establishment and operation of this institution have a strong influence on African Francophone countries and WA
  • XCMG machines operating in tough Russian site
    January 15, 2019
    A fleet of machines from Chinese manufacturer XCMG has proven the reliability of the brand in very tough conditions in Russia. The three machines supplied by XCMG include one LW1200 model, the largest wheeled loader made by the company, as well as two DL900A wheeled dozers. Despite the extremely harsh winter conditions experienced at the extraction site in northern Russia’s Arctic Region, the three machines have been able to clock over 20,000 hours. All three machines have been specially configured to cope
  • Roadtec bullish with strong results
    February 21, 2017
    Roadtec says that it saw a strong financial performance in 2016 and has high hopes for 2017. Part of Astec Industries, Roadtec says that it finished 2016 exceeding its sales performance goals. The firm says that the asphalt paving market benefited from the passage of the 6-year FAST-ACT Highway Bill on December 4th, 2015. Astec Industries and Roadtec played important roles in an industry-wide campaign calling for US legislators urging them to pass the bill. “Through these efforts and many others in our i