Skip to main content

More investment needed for road maintenance

As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.
March 13, 2014 Read time: 3 mins
As the Northern Hemisphere recovers from yet another tough winter, the road system in many countries can be seen to have taken a heavy battering. Potholes abound in many countries, the legacy of cold weather, and this has been made worse by heavy rain that has caused widespread flooding and also damaged bridges.

Part of the problem is one of the methods used for repair. Cheap, low quality repairs are common as a quick fix solution for damaged roads. But such construction methods often lead to early failures, costing significantly more in the long run. The cheap road repairs bring technical problems and many asphalt road surfaces fail due to moisture ingress at joints, with the freeze thaw process then breaking away the edgesand further repairs subsequently being needed.

But the problems of road maintenance go deeper than potholes. A recent report in the British press for instance suggested that some minor roads in the South West of England have been neglected for so long that they are almost beyond repair and may have to be abandoned. Maintenance has focussed on patching rather than on rebuilding the underlying base, with the result that the road structure is now beginning to give way and any surface repairs are unlikely to last long as they will fail from underneath.

Large temperature variations can cause major problems for road structures and surfaces and in Russia there has been some debate as to whether to use more concrete road construction methods. The failure of the asphalt surfaces on some major Russian highways prompted the authorities to consider concrete roads instead. Russia’s tough climate with its cold winters and hot summers certainly places enormous stresses on road surfaces, making material selection a tricky problem for designers and specifiers.

Both asphalt and concrete roads can be built to withstand the extremes of winter and summer climates. Techniques such as echelon paving can minimise the risk of joint failures in new asphalt surfaces, while joint heating can ensure that repairs last far longer. Hot-on-hot paving techniques can provide resilient surfaces with strong bonds between layers that will wear well despite heavy traffic volumes. Meanwhile machine control technologies and new surfacing techniques can optimise concrete road construction techniques and provide long-lasting roads that will perform far better in terms of skid resistance and road noise.

The technology to deliver longer lasting roads is available. But tight budgets mean that road authorities are skimping on their spending, storing up problems for the future.

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Polish road strengthened by Tensar
    July 31, 2012
    Consultants have specified Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards. The use of Tensar geogrids enabled consultants Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar. The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue crackin
  • Prized recycling
    June 13, 2012
    Wirtgen has won the US Cold Recycling Award 2012 for applying its cold recycling structural road rehabilitation technology on Interstate I-81 in eastern America. The I-81 is one of the major north-south routes running across Virginia state with two lanes in each direction. Increasing traffic volumes and the loads imposed by heavy-vehicle traffic were said by the Virginia Department of Transportation (VDOT) to have left the pavement surface covered with alligator cracks, wheel ruts and patches where minor re
  • Choosing the right modified bitumen made easier
    February 10, 2012
    Choosing the correct high performance binder material for use in asphalt applications has been made easier following a product rebranding exercise by one company. Awareness among highway maintenance contractors of the benefits of selecting polymer modified bitumens when specifying road surfacing materials has risen markedly in the last few years.