Skip to main content

Mobility for loading from Volvo CE

Volvo CE is now offering its L45H and L50H wheeled loaders with a high-speed driveline. This allows speeds of up to 50km/h, helping boost productivity for load and carry operations.
July 14, 2020 Read time: 1 min
Volvo CE offers higher speeds for its latest L45 and L50 wheeled loaders

The firm has opted to offer the increased speed as the machines are often used for travelling long distances between jobsites, where the normal transmission is slow and the alternative of transporting them by truck gets expensive. Some applications, like loading and carrying, also benefit from having a higher operating speed. Cycle times can be cut, boosting productivity.

With three driveline speeds now available (there is also an intermediate driveline that boosts speeds up to 30km/h), customers can choose the option that best suits their needs and applications. In addition, a drive mode selector means that the operator can adjust driveline behaviour to match the work being undertaken.

For more information on companies in this article

Related Content

  • Volvo holds a leading position for future fuels
    June 20, 2025

    The Volvo Group is leading the field in delivering zero emission solutions for the future. The three divisions, Volvo Construction Equipment, Volvo Trucks and Volvo Penta, have all been investing heavily in developing new technologies.

  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.
  • Advances with soil compaction technology
    November 25, 2019
    New advances in soil compaction technology will help deliver speedy construction to tight quality standards - Mike Woof writes