Skip to main content

MOBA’s new PAVE-IR system features a high-speed temperature scanner to enhance road construction quality

MOBA has developed a new temperature scanner system called the PAVE-IR, designed to help operators avoid laying incorrectly heated asphalt. From mixing plant to compaction, getting the temperature of asphalt right is critical. Cold asphalt can lead to road damage, which results in additional costs of up to 46% due shorter surface lifetimes. The new MOBA PAVE-IR aims for an optimum asphalt material mix and the best possible process flow says the manufacturer.
March 6, 2014 Read time: 2 mins
MOBA’s Marcus Waterman demonstrating what a difference the new PAVE-IR system makes to the operator
1228 MOBA has developed a new temperature scanner system called the PAVE-IR, designed to help operators avoid laying incorrectly heated asphalt.

From mixing plant to compaction, getting the temperature of asphalt right is critical. Cold asphalt can lead to road damage, which results in additional costs of up to 46% due shorter surface lifetimes.

The new MOBA PAVE-IR aims for an optimum asphalt material mix and the best possible process flow says the manufacturer.

The MOBA PAVE-IR uses a new high-speed temperature scanning system to monitor the temperature during asphalt paving and document it for the entire project. As a result, contractors can optimise their processes and verify the quality of the paving process.

The system uses an intelligent temperature scanner over the entire paving width of up to eight metres to measure the temperature of the asphalt. The measurement width can be set individually.

With up to 31 measurement points, the scanner achieves an accuracy of ± 2°C at typical asphalt temperatures with the temperature profile being displayed in real-time. As a result, the operator can react at any time if irregularities occur.

In addition, the profile is stored with the GPS position data and transferred to a USB stick. In conjunction with the PAVE Project ManagerTM software, the contractor can evaluate and document the data in the office.

Alternatively, the data can be sent via GSM to a server, where it can be called up at any time with a web application.









%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 69175 0 oLinkExternal www.Moba.de MOBA Mobile Automation Web false /EasySiteWeb/GatewayLink.aspx?alId=69175 false false%>

For more information on companies in this article

Related Content

  • MOBA launches 3D-matic at Intermat
    January 6, 2017
    3D-matic is MOBA’s new levelling system for use with grader and dozer levelling blades. The system has a simple menu structure and works with latest GNSS technology or total station, to deliver exact results corresponding to project data. MOBA 3D-matic is compatible with all MOBA levelling systems, said the company, and it allows an easy upgrade from 2D to 3D.
  • MOBA launches 3D-matic at Intermat
    April 13, 2012
    3D-matic is MOBA’s new levelling system for use with grader and dozer levelling blades. The system has a simple menu structure and works with latest GNSS technology or total station, to deliver exact results corresponding to project data. MOBA 3D-matic is compatible with all MOBA levelling systems, said the company, and it allows an easy upgrade from 2D to 3D.
  • More efficient ground stabilisation with the Allu 3D Positioning System
    January 6, 2017
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in
  • More efficient ground stabilisation with the Allu 3D Positioning System
    April 19, 2013
    The Allu 3D Positioning System will make ground stabilisation works more efficient and more cost-effective, according to the Finnish manufacturer. The GPS-guided system works in conjunction with Allu’s PMX mixing head, which is mounted on an excavator. It is made up from four modules – computer unit with software, touch screen, base station and GPS antennas positioned on the mixing unit. Often used in road construction to firm up soft ground, the ground stabilisation process sees the binder material fed in