Skip to main content

MOBA’s new PAVE-IR system features a high-speed temperature scanner to enhance road construction quality

MOBA has developed a new temperature scanner system called the PAVE-IR, designed to help operators avoid laying incorrectly heated asphalt. From mixing plant to compaction, getting the temperature of asphalt right is critical. Cold asphalt can lead to road damage, which results in additional costs of up to 46% due shorter surface lifetimes. The new MOBA PAVE-IR aims for an optimum asphalt material mix and the best possible process flow says the manufacturer.
March 6, 2014 Read time: 2 mins
MOBA’s Marcus Waterman demonstrating what a difference the new PAVE-IR system makes to the operator
1228 MOBA has developed a new temperature scanner system called the PAVE-IR, designed to help operators avoid laying incorrectly heated asphalt.

From mixing plant to compaction, getting the temperature of asphalt right is critical. Cold asphalt can lead to road damage, which results in additional costs of up to 46% due shorter surface lifetimes.

The new MOBA PAVE-IR aims for an optimum asphalt material mix and the best possible process flow says the manufacturer.

The MOBA PAVE-IR uses a new high-speed temperature scanning system to monitor the temperature during asphalt paving and document it for the entire project. As a result, contractors can optimise their processes and verify the quality of the paving process.

The system uses an intelligent temperature scanner over the entire paving width of up to eight metres to measure the temperature of the asphalt. The measurement width can be set individually.

With up to 31 measurement points, the scanner achieves an accuracy of ± 2°C at typical asphalt temperatures with the temperature profile being displayed in real-time. As a result, the operator can react at any time if irregularities occur.

In addition, the profile is stored with the GPS position data and transferred to a USB stick. In conjunction with the PAVE Project ManagerTM software, the contractor can evaluate and document the data in the office.

Alternatively, the data can be sent via GSM to a server, where it can be called up at any time with a web application.









%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 69175 0 oLinkExternal www.Moba.de MOBA Mobile Automation Web false /EasySiteWeb/GatewayLink.aspx?alId=69175 false false%>

For more information on companies in this article

Related Content

  • Lintec’s CSM 2500 plant offers low transport costs and quick assembly and disassembly
    January 6, 2017
    Lintec’s new CSM 2500 asphalt mixing plant with parallel drum and conventional screening machine will be on show at bauma. The parallel drum on the plant can be used for hot and cold recycling. Capable of producing 160tonnes/hour, the fully containerised configuration of the CSM 2500 is said by its German manufacturer to ensure lower transport costs and quick and efficient assembly and disassembly. The plant has six screening decks, a 60tonne capacity hot stone bin, a 45tonne reclaimed filler silo, produces
  • Ammann unveils first ever 9 tonne roller at bauma
    January 6, 2017
    Ammann will be unveiling its first ever 9-tonne roller as part of a 20-strong range of new rollers that meet Euro 3B and Tier 4 Interim emission standards. Part of Ammann’s largest machine market launch to date and fitted with a Deutz 74kW engine, the ARX 90 tandem roller is said to be Swiss firm’s most important product with regard to volume in global applications. A Tier 3B version of the ARX 90 is due to become available during the course of 2013.
  • Ammann unveils first ever 9 tonne roller at bauma
    March 19, 2013
    Ammann will be unveiling its first ever 9-tonne roller as part of a 20-strong range of new rollers that meet Euro 3B and Tier 4 Interim emission standards. Part of Ammann’s largest machine market launch to date and fitted with a Deutz 74kW engine, the ARX 90 tandem roller is said to be Swiss firm’s most important product with regard to volume in global applications. A Tier 3B version of the ARX 90 is due to become available during the course of 2013.
  • Trimble continues to develop connected community portfolio
    January 6, 2017
    Trimble is demonstrating its sophisticated Connected Site portfolio for heavy civil contractors, which connects assets, information, people, machines and sites. This package can meet a vast array of workflow needs of different stakeholders within the contractor’s organisation and meets demand for greater efficiency, shorter completion times and higher quality. Trimble is demonstrating how its Connected Site solutions leverage real-time wireless data flow between the office and job site. This technology allo