Skip to main content

The missing link from Vemaventuri

April 9, 2025 Read time: 1 min
TEMO Link, from Vemaventuri: concrete temperature and maturity monitoring made simpler

Vemaventuri, part of the Peri Group, has introduced into Europe the TEMO Link, a specialised version of concrete temperature and maturity monitoring.

The existing complete solution, in addition to concrete temperature and maturity monitoring, covers two additional use cases, concrete pressure monitoring and concrete detection and compaction monitoring.  

The system makes temperature and strength estimation simple, sustainable and approachable because of its straightforward installation, cost-effective setup with minimal embedded parts and focus on reusing as much material as possible.

With TEMO Link’s built-in cellular connectivity, construction teams gain real-time insights and can base their decisions on valuable information.

Link also supports various maturity functions for calibration, including the linear Nurse-Saul method (ASTM C1074) and the non-linear Arrhenius function, making it one of the most efficient and cost-effective monitoring solutions to date.

TEMO Link helps accelerate project timelines while keeping budgets on track by providing precise concrete-strength data that allows for earlier formwork striking.  

It helps to lower the risk of thermal cracking, ensuring high concrete quality in all conditions. With real-time alerts sent via the Vemaventuri web application, users stay informed about critical developments without the need for on-site visits.

Additionally, the system ensures full compliance with documentation requirements through 24/7 data tracking and reporting, making concrete monitoring more efficient and reliable than ever. 

For more information on companies in this article

Related Content

  • Peri raises its game with hydraulic cylinder for UP Rosett props
    January 6, 2017
    Peri is highlighting several of its premier products this year, including the company’s panel wall formwork Maximo, its Gridflex grid slab formwork and the Peri UP Rosett Flex props. Intermat also marks the introduction of Maximo into the French market. The product makes the best use of manpower when on-site manpower is at a premium. The one-sided tie installation by only one person reduces the time needed to set up the formwork. Ties are installed from one side without spacer tubes and there is reduced
  • Slurry success
    February 21, 2012
    VSS Macropaver continues to develop its product range with the launch of a sophisticated control system as well as a new materials feeder.
  • Technology makes materials testing quicker and easier
    February 14, 2012
    Sophisticated technology is now being used to make the testing of a wide variety of materials quicker and easier as Patrick Smith reports. Ever since the CE mark became mandatory for asphalt mixes, it also became necessary and important to update the testing equipment and systems used for testing such materials.
  • Pressure is on Superslim formwork
    February 4, 2025
    Temporary works specialist Altrad RMD Kwikform - Altrad RMDK - is helping realign the A452 road over a new rail line for England’s future high-speed trains.