Skip to main content

The missing link from Vemaventuri

April 9, 2025 Read time: 1 min
TEMO Link, from Vemaventuri: concrete temperature and maturity monitoring made simpler

Vemaventuri, part of the Peri Group, has introduced into Europe the TEMO Link, a specialised version of concrete temperature and maturity monitoring.

The existing complete solution, in addition to concrete temperature and maturity monitoring, covers two additional use cases, concrete pressure monitoring and concrete detection and compaction monitoring.  

The system makes temperature and strength estimation simple, sustainable and approachable because of its straightforward installation, cost-effective setup with minimal embedded parts and focus on reusing as much material as possible.

With TEMO Link’s built-in cellular connectivity, construction teams gain real-time insights and can base their decisions on valuable information.

Link also supports various maturity functions for calibration, including the linear Nurse-Saul method (ASTM C1074) and the non-linear Arrhenius function, making it one of the most efficient and cost-effective monitoring solutions to date.

TEMO Link helps accelerate project timelines while keeping budgets on track by providing precise concrete-strength data that allows for earlier formwork striking.  

It helps to lower the risk of thermal cracking, ensuring high concrete quality in all conditions. With real-time alerts sent via the Vemaventuri web application, users stay informed about critical developments without the need for on-site visits.

Additionally, the system ensures full compliance with documentation requirements through 24/7 data tracking and reporting, making concrete monitoring more efficient and reliable than ever. 

For more information on companies in this article

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Sophisticated new loaders
    March 10, 2021
    Sophisticated new wheeled loaders are now coming to market from key suppliers
  • Prepare for ‘interoperability on steroids’
    May 19, 2023
    The gathering of Europe’s toll professionals offers a chance for views to be exchanged by senior people on a number of big issues: and there’s currently an awful lot to think about
  • Leaner WIM enforcement through new solutions
    December 3, 2013
    Guy Woodford reports on a major new Weigh in Motion system, big WIM solution deals and how a leading firm in the sector is warning UK fleet operators to be aware of how leaner enforcement work is helping authorities detect more overloaded vehicles Kapsch TrafficCom announced its keenly awaited new Weigh in Motion (WIM) solution at this year’s ITS European Congress in Dublin, Ireland. The sector-renowned Austrian firm’s latest solution uses a number of sensors and loops to detect whether the vehicle exceeds