Skip to main content

Metso’s a Norwegian big screen legend

Aggregates producer Franzefoss has turned to Metso as it looks to upgrade capacity on its existing Steinskogen quarry site outside of Oslo, Norway. The new crushing and screening installation from Metso, which Franzefoss is looking to help secure healthy commercial growth, includes design, fabrication, installation and commissioning for secondary and tertiary aggregate production. In addition to the fully automated crusher and screening installation to monitor and ease the control of the operation, the n
April 2, 2014 Read time: 2 mins
Aggregates producer Franzefoss has turned to Metso as it looks to upgrade capacity on its existing Steinskogen quarry site outside of Oslo, Norway.

The new crushing and screening installation from 6934 Metso, which Franzefoss is looking to help secure healthy commercial growth, includes design, fabrication, installation and commissioning for secondary and tertiary aggregate production. In addition to the fully automated crusher and screening installation to monitor and ease the control of the operation, the new plant will be equipped with an automated truck loading station. Full production is scheduled for March 2015.

The new secondary crushing plant system is targeted at 375tonnes/hour and will include one HP 400 cone crusher and two TS5.2 screens to produce ballast railway and end-products of 4/16 and 16/32 basalt aggregate. The tertiary stage, which relies on two HP 4 cone crushers and two TS 4.2 screens, will produce several fractions destined for concrete and asphalt use. Conveyors and all ancillaries will ensure the handling and the storage of the material. The order has been included in Metso Mining and Construction's Q4 2013 orders received.

"In-depth analysis of the customers' needs, close collaboration with Franzefoss to position the tailor-made installation and confidence in Metso's crushing and screening solutions paved the way to this new order,       " said Eirik Brekke, vice president, Scandinavia sales Area, Mining and Construction, Metso.

Franzefoss Pukk AS is a major aggregate producer in Norway with an annual production of four million tonnes through 12 different sites.

For more information on companies in this article

Related Content

  • Kleemann premieres MOBISCREEN MSS 1102 PRO
    May 16, 2025

    Kleemann’s new MOBISCREEN MSS 1102 PRO scalping screen is now coming to market, in addition to the firm’s new mobile impact crusher and proven SPECTIVE CONNECT operating concept.

  • HAZEMAG combines roller screen/feeder breaker
    January 6, 2017
    HAZEMAG has realised an intelligent, efficient, compact secondary crushing preparation plant with a minimised overall height for the production of 1,500tonnes/hour of lignite following an order last year from P.T Indonesia Pratama, Indonesia. It was the customer’s wish to get an intelligent crushing solution and a low overall height of the preparation plant. HAZEMAG combined a roller screen with the field-tested feeder breaker HFB 0714, thus offering screening and crushing in one unit, which has dimensions
  • Caterpillar has a Vision that includes total project site overview
    April 5, 2016
    Caterpillar may be on its financial back foot, but a recent event showed the company has a vision far beyond this or the next financial year – David Arminas reports. Many construction machinery manufacturers have some data collection and analysis systems for their heavy equipment. For a good decade, manufacturers have been moving in this direction, first as retrofit packages on machines in the field and increasingly as standard on newer models. Caterpillar is no exception among manufacturers that are movin
  • Recycling concrete runway saves time, money
    February 17, 2012
    Nashville International Airport in the US state of Tennessee has revamped its facilities following extensive upgrades being carried out on its oldest runway in a project worth some US$23 million. The airport authorities realised that to improve both capacity and safety a major improvement of runway 2L-20R was required, with full-depth reconstruction needed to provide the necessary structural strength and working life. Engineering firm Garver Aviation worked on the project to rehabilitate the portion of Runw