Skip to main content

Metso’s a Norwegian big screen legend

Aggregates producer Franzefoss has turned to Metso as it looks to upgrade capacity on its existing Steinskogen quarry site outside of Oslo, Norway. The new crushing and screening installation from Metso, which Franzefoss is looking to help secure healthy commercial growth, includes design, fabrication, installation and commissioning for secondary and tertiary aggregate production. In addition to the fully automated crusher and screening installation to monitor and ease the control of the operation, the n
April 2, 2014 Read time: 2 mins
Aggregates producer Franzefoss has turned to Metso as it looks to upgrade capacity on its existing Steinskogen quarry site outside of Oslo, Norway.

The new crushing and screening installation from 6934 Metso, which Franzefoss is looking to help secure healthy commercial growth, includes design, fabrication, installation and commissioning for secondary and tertiary aggregate production. In addition to the fully automated crusher and screening installation to monitor and ease the control of the operation, the new plant will be equipped with an automated truck loading station. Full production is scheduled for March 2015.

The new secondary crushing plant system is targeted at 375tonnes/hour and will include one HP 400 cone crusher and two TS5.2 screens to produce ballast railway and end-products of 4/16 and 16/32 basalt aggregate. The tertiary stage, which relies on two HP 4 cone crushers and two TS 4.2 screens, will produce several fractions destined for concrete and asphalt use. Conveyors and all ancillaries will ensure the handling and the storage of the material. The order has been included in Metso Mining and Construction's Q4 2013 orders received.

"In-depth analysis of the customers' needs, close collaboration with Franzefoss to position the tailor-made installation and confidence in Metso's crushing and screening solutions paved the way to this new order,       " said Eirik Brekke, vice president, Scandinavia sales Area, Mining and Construction, Metso.

Franzefoss Pukk AS is a major aggregate producer in Norway with an annual production of four million tonnes through 12 different sites.

For more information on companies in this article

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.
  • Asphalt plant innovations unveiled
    May 8, 2019
    New asphalt plant technology is being introduced by a range of manufacturers to meet varying needs and increase system versatility.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.