Skip to main content

Measuring durability of Australia's roads

The Danish Road Directorate has signed a contract with the Australian states of New South Wales and Queensland regarding the measurements of more than 16,000km of roads.
April 5, 2012 Read time: 2 mins
The Danish Traffic Speed Deflectometer on its way to Australia
The Danish Traffic Speed Deflectometer on its way to Australia

The 2284 Danish Road Directorate has signed a contract with the Australian states of New South Wales and Queensland regarding the measurements of more than 16,000km of roads.

The Directorate sees the cooperation as a great step forward for the Danish road research, and as a consequence of the agreement the Danish Traffic Speed Deflectometer has been shipped to Australia to measure the bearing capacity and hence the durability of the roads.

This task has already been successfully undertaken on the Danish road network and "holds a promise of saving a lot of money on road maintenance."

The Danish Road director, Per Jacobsen said:

"This agreement is a giant boost for the Road Directorate as it demonstrates our ability to act in the global market for road research and technology.

"And the job is also to the benefit of the Danish road sector, as we are constantly striving to perform the best possible measuring to enable the right prioritising of road maintenance.

The assignment can help us with this by providing important data and further more we will be able to use the equipment while it is winter time in Denmark."

The Traffic Speed Deflectometer moves at traffic speed as opposed to earlier versions (falling-weight deflectometer) that required blocking the road and disturbing road users. It was developed in cooperation with 2283 Greenwood Engineering and with support from the 2282 Danish Ministry of Economic and Business Affairs.

The assignment is due to finish in late 2010.

Related Content

  • Manitowoc MLC650 cranes keep Champlain Bridge on track
    October 28, 2016
    Two Manitowoc MLC650s are working on a project to replace the Champlain Bridge that spans the Saint Lawrence River in Montreal, Canada. The engineering consortium - Signature on the Saint Lawrence Construction (SSLC) – is assigned to the task. The capacity and reduced ground preparation made possible by the MLC650’s VPC-MAX attachment – as well as the ease of use of its Crane Control System (CCS) – are helping the team stay on schedule. The Champlain Bridge connects one of North America’s busiest road
  • ERF and Latvian authorities plan safe and sustainable road seminar
    November 15, 2013
    ERF and Latvian State Road co-organise seminar on safer and sustainable roads Public road administrations are facing considerable challenges within Europe. In fact, the slogan ‘more with less’ captures their situation rather well as they are constantly expected to deliver higher levels of service against a backdrop of declining investment and increasing traffic volumes.
  • Eight Tips to Getting the Most ROI from Your Sealcoating Equipment
    August 29, 2019
    Maximizing return on investment doesn’t take a mathematician.
  • Road paving record set
    July 10, 2020
    Aggregate Industries has set what it believes to be a road paving record.