Skip to main content

MatTracker ensures densities at lane joints

TF-Technologies which specialises in technology related to asphalt paving has invented a new means of ensuring asphalt density along the longitudinal joints between lanes. The MatTracker, developed just in time for bauma 2016, ensures that the lap width is correct and controls the position of the paver.
April 18, 2016 Read time: 1 min
The MatTracker controls overlap distance between lanes to ensure good densities
8410 TF-Technologies which specialises in technology related to asphalt paving has invented a new means of ensuring asphalt density along the longitudinal joints between lanes. The MatTracker, developed just in time for bauma 2016, ensures that the lap width is correct and controls the position of the paver.

“One of the critical elements in ensuring good density at joints is to ensure that you have the correct overlap,” said TF-Technologies Lisbeth Teilmann. The MatTracker uses a NIR camera and advanced image processing algorithms to follow the edge of an existing lane of paved asphalt and controls the side plate of the screed to maintain a specific overlap.

Demand from the US market, where contractors are incentivized to achieve required densities at joints, triggered this development, said Teilmann. “We plan to bring it to the market with some of the US OEMs,” she said.

Field trials of the system, which has a patent pending, were due to begin after bauma.

All videosAll show news

For more information on companies in this article

Related Content

  • Texas highway project tackles congestion
    April 10, 2012
    A new highway project in Texas will tackle peak congestion
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • G&Z’s improved S600 slipformer
    February 18, 2020
    G&Z is now offering its successful S600 Paver, first introduced in 2010, with a new Tier 4 Final emissions compliant engine and enhanced width capability. The new S600 Power Unit was completely redesigned in 2019 and features:
  • Benefits of bitumen technology research
    March 15, 2012
    Bitumen technology is benefiting from years of research and development - Kristina Smith. On a 2.7km loop of road in Auburn in Alabama, US, a lorry driver drives his triple-truck round and round. During his eight-hour shift, he will have covered 544km, with another driver waiting to take over from him for the next shift. Their mission is to seriously damage the road. This is the National Center for Asphalt Technology (NCAT), where sponsors from states and private companies pay to test out new materials and