Skip to main content

Manitowoc’s Potain MR418 luffing jib crane comes to Europe

From Manitowoc’s top-slewing line, the company will introduce to Europe its Potain MR418 luffing jib crane. Both the MR418 and MDT389 are notable for their capacity and size, which allow contractors to make significant cost and time savings on projects. With a maximum capacity of 24tonnes, the MR418 is one of the largest luffing jib cranes from Potain. While the MDT 389, with a 16tonne maximum capacity, is the largest crane in the new CCS topless range. The MDT219 is the largest model in the new MDT C
January 6, 2017 Read time: 2 mins
From 2123 Manitowoc’s top-slewing line, the company will introduce to Europe its 5916 Potain MR418 luffing jib crane.

Both the MR418 and MDT389 are notable for their capacity and size, which allow contractors to make significant cost and time savings on projects.

With a maximum capacity of 24tonnes, the MR418 is one of the largest luffing jib cranes from Potain. While the MDT 389, with a 16tonne maximum capacity, is the largest crane in the new CCS topless range. The MDT219 is the largest model in the new MDT CCS City Crane range and is available in 8tonne or 10tonne versions.

In addition to highlighting its products, Manitowoc will also be showcasing its range of value-added support services. These include Manitowoc Crane Care, its industry-leading customer support division; EnCORE, its refurbishment and remanufacturing arm; Lift Solutions, its in-house engineering team that handles special customer requests for machinery, products or lifts; and Manitowoc Finance, its funding arm. These services are all designed to help Manitowoc crane owners get the most from their purchase and the fastest possible rates of customer payback.

Manitowoc, based in Manitowoc, in the US state of Wisconsin, has annual sales of round US$3.9 billion, with half coming from outside the US.

For more information on companies in this article

Related Content

  • Chinese manufacturers competing in quarrying segment
    March 5, 2015
    Chinese firms are now gearing up to tackle the quarrying market - Mike Woof writes. One of the key developments of note for the bauma China exhibition in late 2014 was the number of Chinese manufacturers now looking to compete in the quarrying sector. Also of note was how Western manufacturers are also taking the emergent markets seriously, developing machines to counter this increased competition from China. In many cases Western manufacturers have partnered with Chinese firms, bought out Chinese companies
  • Volvo CE boss highlights company success in China
    January 6, 2017
    Volvo Construction Equipment (Volvo CE) has invested over US$150.93 million (SEK1bn) in expanding capacity and construction equipment offering in China and had secured a leading position in national wheeled loader and excavator sales, said Volvo CE president Pat Olney. The Swedish construction equipment manufacturer is also keen to develop its SDLG brand, which, Olney stressed, has helped Volvo CE secure its status in the Chinese wheeled loader and excavator market.
  • Volvo CE boss highlights company success in China
    November 28, 2012
    Volvo Construction Equipment (Volvo CE) has invested over US$150.93 million (SEK1bn) in expanding capacity and construction equipment offering in China and had secured a leading position in national wheeled loader and excavator sales, said Volvo CE president Pat Olney. The Swedish construction equipment manufacturer is also keen to develop its SDLG brand, which, Olney stressed, has helped Volvo CE secure its status in the Chinese wheeled loader and excavator market.
  • Zoomlion looks to expand its operations through organic growth and acquisitions
    January 6, 2017
    Zoomlion is set to grow its operations as Helen Huang, general manager for the firm’s construction hoist machinery branch explained. The firm intends capitalise on its purchase of the tower crane technology from German firm Jost. Huang said, “We have a two year licence with Jost. We purchased the whole set of topless tower crane technology. This is arranged as a two year technology transfer, although there may be the option to extend the period.”