Skip to main content

Manitou previews MC 25 and MC30 forklifts at Intermat

Manitou previewed the MC 25 and MC 30 rough terrain forklifts on the 60th anniversary of launching its first forklift. The MC 25 and MC30 have loading capacities of 2.5 tonnes and 3 tonnes respectively, and are 1.45m wide with ground clearances of 30cm for easy manoeuvrability around works sites. The forklifts have maximum speeds of 25 km/h and have been certified as roadworthy, so they can be used over long distances. Users do not have to raise the whole cabin to get at the engine but can access compon
April 23, 2018 Read time: 2 mins
Manitou MC30
2106 Manitou previewed the MC 25 and MC 30 rough terrain forklifts on the 60th anniversary of launching its first forklift.


The MC 25 and MC30 have loading capacities of 2.5 tonnes and 3 tonnes respectively, and are 1.45m wide with ground clearances of 30cm for easy manoeuvrability around works sites. The forklifts have maximum speeds of 25 km/h and have been certified as roadworthy, so they can be used over long distances. Users do not have to raise the whole cabin to get at the engine but can access components via a cover behind the seat for easy maintenance.

Manitou had a turnover of €1.6 billion in 2017 – a rise of 19% over the previous year, said Michel Denis, Manitou chief executive officer and president. Speaking at Intermat, he said that 80% of the company's sales are now outside France. Manitou recently opened a new R&D test centre capable of putting its products through the equivalent of 10,000 hours of operation – part of the company's drive to ensure the reliability of its machines, he added.

For more information on companies in this article

Related Content

  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • Asphalt plant innovations
    June 14, 2019
    New developments in asphalt plant technology are offering better cost efficiency and materials quality for the industry
  • Serbia’s pan-European Corridor X is in the slow lane
    October 23, 2017
    It’s been slow progress on Serbia’s Corridor X project. Gordon Feller reports. Back in the early 2000’s, the European Union undertook an ambitious programme to link the main cities of its south-eastern region. This involved connecting five key seaports – the Greek cities of Patras, Igoumenitsa, Piraeus and Thessaloniki as well as Romania’s Black Sea city of Constanta. Initially the plan involved two motorways across Greece. The first was a new 780km route including a branch to Ormenio on Greece’s north-eas
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b