Skip to main content

MAN boosts truck mixer payload

MAN has introduced a new design of hypoid tandem axle for payload-sensitive transport tasks, such as cement haulage. Shown on its TGS truck mixer chassis, the new axle design weighs in at approximately 280kg lighter than a conventional planetary axle, equating to greater payload potential. The four-axle MAN TGS 32.400 8x4 BB is specially designed for this purpose – it uses a weight optimised frame made of high-strength steel, a 298kW engine combined with the MAN TipMatic automated gearbox, and aluminium
April 12, 2016 Read time: 2 mins
MAN claims the highest payload in the industry for its TGS truck mixer
8404 MAN has introduced a new design of hypoid tandem axle for payload-sensitive transport tasks, such as cement haulage.

Shown on its TGS truck mixer chassis, the new axle design weighs in at approximately 280kg lighter than a conventional planetary axle, equating to greater payload potential. The four-axle MAN TGS 32.400 8x4 BB is specially designed for this purpose – it uses a weight optimised frame made of high-strength steel, a 298kW engine combined with the MAN TipMatic automated gearbox, and aluminium wheel rims. The result is a chassis weight of 9,065kg without driver, making the most of payload potential within a gross vehicle weight of 32tonnes.

MAN’s new tandem axle design also addresses a payload shortfall with the use of thermo-insulated bodies used for transporting asphalt – choosing the lighter hypoid axle can offset payload loss from the weight of tipper body insulation, the company said.

There are other advantages from using this type of axle, it went on. Fuel consumption is claimed to be slightly lower than its trucks fitted with planetary axles, while ground clearance is higher beneath the axle – typically adding 4cm of additional clearance.
All videos

For more information on companies in this article

Related Content

  • Liebherr achieves record turnover in 2012
    April 10, 2013
    The Liebherr Group achieved its highest turnover in its history in 2012. Turnover climbed over than 9% to €9.1 billion, while the company invested a total of €840 million in its operations. The 2012 business year progressed well for the Liebherr Group. Although the reduced dynamism of the world economy had a noticeable effect on orders received in the final months of the year, this no longer influenced turnover significantly. The Group increased its total turnover in the past business year by more than €760
  • Innovation in asphalt paving solutions
    February 9, 2012
    This year has seen a wide array of innovative additions to the asphalt paving market - Mike Woof reports. The worldwide asphalt paving market is both competitive and complex, with an array of important players jostling for position. At the same time, paving controls have taken a great leap forward with the development of accurate 3D systems that can use a combination of laser and GPS positioning. Leica Geosystems, Topcon and Trimble have all introduced new packages for the asphalt paving sector and these
  • Terex's new TA300 articulated truck which joins the company's new product family of ADTs
    February 6, 2012
    Terex has launched its new TA300 articulated truck which joins the company's new product family of ADTs. Terex claims that the TA300, which replaces the TA30 model launched in 2002, is the only hauler in 30tonne market that has fully independent front suspension (IFS) as standard. The model joins the TA350 (previously TA35) and TA400 (TA40), launched in September, 2009. and the TA250 being launched in April.
  • Aggregate Industries lightens the load for the Acton Swing Bridge
    October 2, 2018
    Aggregates Industries recently lightened the load for the 73m-long bow string truss Acton Swing Bridge in England. When opened in 1933, it was the first floating swing bridge in the UK – floating on a pontoon. The 84-year-old bridge, which is cared for by the Canal & River Trust charity, carries the busy A49 road over the River Weaver Navigation, in the county of Cheshire. A recent €1.7 million complete refurbishment included strengthening works to the underside of the bridge as well as improvements to its