Skip to main content

Lyndon Thomas takes biggest UK order for Doosan Trucks

Contractor Lyndon Thomas, in Northampton, England, has taken delivery of eight Doosan DA30-5 articulated dump trucks - the biggest single UK order for Doosan trucks. The order also confirms Lyndon Thomas as the owner of the largest fleet of dump trucks in the East Midlands area. Established in 2010, Lyndon Thomas offers a range of services including earthmoving, contract crushing and screening, plant hire, demolition and distribution of all types of aggregate. The Stage IV trucks were purchased along
January 12, 2017 Read time: 2 mins
Doosan DA30-5 ADT: big truck for a big dealer
Contractor Lyndon Thomas, in Northampton, England, has taken delivery of eight 695 Doosan DA30-5 articulated dump trucks - the biggest single UK order for Doosan trucks.

The order also confirms Lyndon Thomas as the owner of the largest fleet of dump trucks in the East Midlands area. Established in 2010, Lyndon Thomas offers a range of services including earthmoving, contract crushing and screening, plant hire, demolition and distribution of all types of aggregate.

The Stage IV trucks were purchased along with a Doosan 30tonne DX300LC-5 Stage IV crawler excavator from regional Doosan dealer Murley Construction.

Like all Doosan ADTs, the DA30-5 features an articulation hinge positioned behind the turning ring to provide equal weight distribution to the front axle even during maximum steer articulation. This together with a free-swinging rear tandem bogie ensures equal distribution of weight to each wheel and guarantees permanent six-wheel contact and drive for equal power distribution and excellent performance on difficult terrain.

Doosan said that the forward turning point, the tandem bogie and the sloping rear frame results in rough and soft terrain capabilities and avoids the need for electronic aids such as traction control.

Lower fuel consumption of Doosan ADTs is down to a combination of features including a new 759 Scania diesel engine and a ZF EP transmission that improves the transfer of power from the engine to the wheels. When this is coupled with the enhanced rear differential system it reduces engine rpm and further increases machine durability.

The Scania DC9 276kW diesel engine meets the Stage IV/Tier 4 Final emission regulations by way of Selective Catalytic Reduction (SCR) and Exhaust Gas Recirculation (EGR) technologies along with an electronic engine brake system, one of four brake systems on the trucks.  Doosan’s Stage IV/Tier 4 Final ADTs do not need a diesel particle filter (DPF) to meet the emission regulations.

The new DX300LC-5 is also powered by the Scania DC9 five-cylinder diesel engine, with an output of 202kW of power at 1800 rpm, providing a 27% increase in engine power and a 30% boost in torque over the previous LC-3 model.

For more information on companies in this article

Related Content

  • Advanced, low emission, fuel efficient earthmoving
    February 23, 2012
    Manufacturers are rolling out sophisticated machines for the European, North American and Japanese markets - Mike Woof reports. This year has been a pivotal period for the development of advanced, low emission earthmoving machines. During 2011 an array of manufacturers have introduced new models designed to comply with the latest Stage IIIB/Tier 4 Interim emissions regulations introduced for
  • It’s Miller time for Doosan excavators and loaders in Scotland
    April 17, 2018
    Scottish Doosan dealer Balgownie has supplied new Doosan DX225LC-5 22tonne and DX255LC-5 25tonne excavators and a new DL420-5 wheeled loader to Miller Plant. Miller Plant offers services from bulk earthworks and contract crushing and screening to plant hire, site clearance, demolition, aggregate supply and heavy haulage and tipper hire. As the machines will do more than 60 hours a week each, they come with a peace-of-mind five-year warranty and Balgownie’s fast response to requests and service support.
  • Haul truck developments
    October 31, 2022
    Several key manufacturers are offering improved designs for the ADT market, with new names also entering this segment
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra